you are working as a QC in hihg rise building. when what"s
ur responsibilities works?
Answer Posted / jeyakumar
Refer Projects quality plan and do the job.If any
deviations found inform site engg/incharge and do rectify
and redo the same as per PQP.
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
what are the values of compressieve strenght?
Explain the difference between shear and tensile strength.
How to calculate the cement consumption in RR Masonry in CM 1:8 for the foundation of Ground Level Reservoir
What tor stands for in tor steel?
Design a rectangular channel.
Different sizes of Hollow blocks and its weight. Thanks.
How do you determine specific gravity of cement?
What is the requirement for over all CG of DG from the foundation surface to absorb the vibration of heavy set.
What is Rankine Cycle?
how to calculate the mortar for 10'*10' size room for both plastering and for masonry work?
For plate load test why we are applying pressure 3 times the proposed allowable bearing pressure? Is there any supporting standards for this?
How to calculate the area of a irregular sized land in square feet?and what will be the total area of this land South-51.1ft , North-47.7ft , East-53.3ft , West-54ft ?please explain me how to calculate?
What is the meaning of Brick- M 35 grade? Is it a common brick or it's a concrete brick?
In Rcc ratio calculation I wanted to know quantity of Steel also.
HOW MANY BAGS OF CEMEMT USED IN PER M2 OF PARTITION WALL