What"s mean by water macadam road (WBM)?
Answers were Sorted based on User's Feedback
Answer / suresh
wbm means water bound mecadam road.it is the rural roads.60
and 40 mm coarse aggregate mixed with red gravel laid on
earth then binding with water pouring with heavy weight
roller compaction.
| Is This Answer Correct ? | 18 Yes | 1 No |
TELL ME THE EQUATION FOR OGEE SPILLWAY
How much Strength of the cube can attain in 7days comparative 28 days strength?(as per IS code) ( specify the ref.clause also)
in the construction of residential building what type of tank are used?where?why & what is its purpose?
Specific gravity of Cement? Water?
in staad ,why we realease a moment of a member ? what is affect if we realease a moment
Why the height of the bridges over the river are very low?
how can can column be corrected when the design is not safe ? is the increasing the clearcover a solution?
say the propotions of different concrete mix desidn(M20 M15 M25 M25 M30)
Explain soil analysis?
what is difference between expansion and construction joint?
how much nails used in 1 sq m shuttering
16 Answers L&T, Pearls, Simplex,
SAND AND STONE AGGREGATES WASTAGE PERCENTAGE IN CONCRETING WORK?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)