what is meant by VDF FLOORING? why it is used?
Answers were Sorted based on User's Feedback
Answer / mitesh patel
# Floors in factories and industries have concrete being the
most versatile of flooring material, has been in use for a
long time. To overcome the deficiencies of concrete a system
was devised to improve the properties of such concrete
floors. This system is "Vacuum Dewatered Floors.
Process:
In this system, concrete is poured in place & vibrated with
a poker vibrator. Then a screed vibrator is run over the
surface, supported on channel shuttering spaced 4.0 meters
apart. The screed vibrator is run twice to achieve optimum
compaction & leveling. After this a system of lower mats &
top mat is laid on the green concrete & this is attached to
a vacuum pump. This draws out excess water.
Benefits:
1. Compressive strength of floor increases by upto 60%
2. Tensile strength increases by @ 70%
3. Cement consumption is reduced to the extent of 40%, no
cement is required separately for finishing the surface.
4. Abrasion resistance of the floor increases by @ 60%
resulting in less wear and rear of the floor surface.
5. Shrinkage of concrete is reduced and floor wraps less.
| Is This Answer Correct ? | 25 Yes | 1 No |
Answer / sureshpittas
vdf flooring means Vaccum Dewatering flooring... vdf
flooring is used for smooth surface area of
flooring..Generally vdf flooring used for parking area why
beacause it easy to move freely .vdf flooring is not only
for parking areas but also we can use any floors... And we
can use M25, M30 M35, M40 Concrete...and Hardener bag must
be used for 1SQMETER -3kgs should be used compulsory.
| Is This Answer Correct ? | 11 Yes | 6 No |
Answer / p.simhachalam
sir how to repair the vdf top surface ,if in case damaged
| Is This Answer Correct ? | 2 Yes | 0 No |
how we check the thickness and line of ceiling plaster.
1 cft of brickwork 1:6 mortar ratio need 12 numbers of bricks so find the quantity of sand and number of cement bags
steel which is used for reinforcement and structures why they are directly used why GALVANISATION or PRIMER is not done to prevent from corrosion
sometimes, in a column, reinforcement is provided equally on 2 sides and sometimes on 4 sides.what will be the difference in the method of designing?
WHAT IS YOUR FUTURE PLANS FOR THE COMPANY IF PERMANENTLY EMPLOYED
what will happen if we pass electric current through rebars of RCC Slab(is there any strength reduction of concrete during this)??????????
2 Answers Precast, SPC Systems,
for concrete cubes samples.. what if the 7 days gain the strength of 42.34 mm/2 and the 28 days only gain the strength of 37.5 mm/2?
How do you derive the quantity of cement & sand in brick work construction in 1Meter cube, using CM 1:6 and bricks of size 19*9*9 cm
what is daily progress of a steel fixer average how many kilograms he can fix in 8 hours average
1 Answers Al Latifia Trading Contracting,
what is correct temperature for pouring concrete?
need to join coaching institute in coimbatore tamilnadu ......say me the best coaching for IAS
Is it necessary to apply tack coat over the primecoat. IF not what happens.answers other than 1.to superimpose the next layer(2) to adhere the layers so as to form homogenity.
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)