Answer Posted / suresh
wbm means water bound mecadam road.it is the rural roads.60
and 40 mm coarse aggregate mixed with red gravel laid on
earth then binding with water pouring with heavy weight
roller compaction.
| Is This Answer Correct ? | 18 Yes | 1 No |
Post New Answer View All Answers
what is the formula to find the sttel (bar)length in beam having bent up at l/4 t 45 degree & 60 degree.
CAST EFFECTIVE WATER SUMP CONSTRUCTION DETAIL
What are the different methods for drawing an arc?
Q 1) 1 Mason and 2 LABOUR / _________CUM brick work Q 2) 1 Mason and 1 LABOUR / _________SQ FT Plaster work Q 3) 1 Carpenter & 2 Labour/_________SQ FT shuttering work Q 4) 100 SQ FT roof slab concreting ____________mason and labour required
The properties of concrete HA-30 and how does it differ with M 30 (specify the important characteristics like workability,strength,mix design,slump test value)and what is the standard relating to it
What is the difference between 53 grade and 43 grade cement
How to calculate the load of partion in flat slab if we use brick?
Actually i am confused that how to calculate the bending moment for a semi-circular beam and curved slab.If any one have a good idea about the matter,please give the answer with a suitable example. Thank you......
What are the alternate material for steel, Sand and aggregate
What is geopolymer based concrete?
residential buildings,mixing of concrete,structural,construction material,site handling.
how to calculate the length diamond shaped striupps in column
WHAT IS THE CAUSES OF RUTTING ON FLEXIBLE PAVEMENT?
Define Who designed the city of Washington DC?
what is the cost of rcc roof casting of 400 sq. ft. in kolkata