Answer Posted / suresh
wbm means water bound mecadam road.it is the rural roads.60
and 40 mm coarse aggregate mixed with red gravel laid on
earth then binding with water pouring with heavy weight
roller compaction.
| Is This Answer Correct ? | 18 Yes | 1 No |
Post New Answer View All Answers
How many square meter can a worker/labor demolish a structure per day?
What is quantity of cement and sand required for 2000sqft of tiling?
Please let me know what is the simplest way of Calculating Mix Designs
cement mortor 1:5 for 30 m2 12 mm tk plastering so how to calcualte its rate
How to fix toll charge for a particular vehicle at toll booths in a highway?
How to calculate the force on a column of three story building. What should be the base concrete height?.
What are your future hopes for this job?
Design a shear wall of length 4.20 m and thickness of 250mm subjected to the following forces.Assume Fck = 25Mpa and Fy = 415Mpa and the wall is a high wall with central part 3440mm x 250mm and two 380mm x 760mm strong bands at each end with following loading. S.No. Loading Axial force Moment Shear 1 DL+LL 1950 600 20 2 Seismic load 250 4800 700
we have a bore well 275 depth & water is deliver at distance of 1000 feet from the borewell here iam not include the distance of depth and the deliver water horizontally at our reserviour tank on ground level
suppose we have a tendency to make a hole on the surface of the simple supported beam, than where we goes to make it?
how to calculate the material from ratio of work PCC, RRM,POINTING, RCC
which steel is better for residential building tmt steel or hysd steel
What is the tallest man made structure in the world?
In Residential home construct footing,beam, column,lintel,rcc roofs which dia rod used how to self assumed
define the strength