How i calculate Cement sand Quantities in 100 Sq.ft Plaster?
Answer / soyeb badgujar
ITS VERY SIMPLE
first we calculated total volume of plaster mortar by
area x plaster cot ( thickness of plaster )
100 inch x 0.5 inch = 50 feet cube
than check ur ratio of plaster like ( 1 : 6 )
now cement required = 1/7 x 50 = 7.14 feet cube
so cement bag = 7.14/35.28 = 0.202 meter cube
now the number of bag requirement of cement is = 0.202/.035 =5.78 approximate 6 bag requred
| Is This Answer Correct ? | 6 Yes | 3 No |
What"s mean by water macadam road (WBM)?
How much of fly ash is allowable in Portland cement and what is the disadvantage when the level of fly ash is increased?
How to calculate the quantity of brick or mortar in m3. like in 1m3 brick =....no. .......mortar=....m3
please give me the rates of RCC(CUM), PCC(CUM), Brick Work(CUM), Tile Flooring, Saria Shuttering
How Can Calculate Plastering Quantities For 260.04 square meter by using CM 1:4 with 25mm Thick ?
which is higher specific gravity or bulkdensity
what is workability,define it?
why is the column design?
can we go for short rcc column without any steel rienfocement carrying truely axial load???
How To do Steel Design of Beam,Columm,Slab,Staircase,Wall?
How did the romans get water up hills using aqua ducts?
How you can use different dimension tools in cad? What are the different dimensions available?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)