Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


how you calculate the data (all parameter) after transient
response method i.e.pile intigrity test on pile.



how you calculate the data (all parameter) after transient response method i.e.pile intigrity test..

Answer / abhijit

1.by integration,
2.by static formulea

Is This Answer Correct ?    1 Yes 0 No

Post New Answer

More Civil Engineering Interview Questions

what is pqc

0 Answers   Student,


What is design life of a bridge?

3 Answers  


Dear Friends am S.PRABHU looking for job chnage i have wonderfull exposure to both Construction works & i have a experience 11 years if any found any suitable opening, please Contact 9986539249

1 Answers   Tata Steel Limited,


what is the minimum and maximum water cement ratio

6 Answers  


57. Calculate the volume of a truck loaded with stone chips whose data are as follows– 5 Top Length - 13&#61602;-9&#61618;, 13&#61602;-10&#61618;, 13&#61602;-09&#61618; Bottom Length - 13&#61602;-11&#61618;, 13&#61602;-10.5&#61618;, 13&#61602;-10&#61618; Top width - 8&#61602;-7.5&#61618;, 8&#61602;-8&#61618;, 8&#61602;-7&#61618; Bottom width - 8&#61602;-7&#61618;, 8&#61602;-8&#61618;, 8&#61602;-7.5&#61618; Depth - 2&#61602;-0&#61618;, 1&#61602;-11.5&#61618;, 1&#61602;-10&#61618;, 1&#61602;-11&#61618;, 1 &#61602;-10.5&#61618;, 1&#61602;-11.75&#61618;, 1&#61602;-11&#61618;

0 Answers   L&T,


How to take labor charges for construction of 1cum of concrete?

0 Answers  


where do Tie beams used in foundations?

1 Answers   Architects,


deshuttering time for RCC for DPC over the foundation.

4 Answers  


which is cover of r.c.c. column,beam and slab

5 Answers   Cube, RPP,


What is bending moment

2 Answers   Skyline Builders,


how to cement bag calculate m25 grade

4 Answers   Cozy Group,


calculate qty of sand in 15 mm plaster for 100 sqm.

5 Answers   NHPC, Vellapally,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)