how many hacking to be made in one sqft for concrete surface
before plastering as per the IS Code
Answers were Sorted based on User's Feedback
Answer / chalapathi raja kmv ltd
35 to 45 nos per one sq ft
3mm depth
5cm c/c
| Is This Answer Correct ? | 2 Yes | 0 No |
What is the Roll of Water Bonding under VDF road?
what is the difference between compaction and consolidation??
how to calculate steel columns beams and slab please give me brief calculation
14 Answers Focus, Haven Foundation, Indian Railways, Surya Builders, VICC,
What is difference between limit state and working stress method? How it is applies in building structure.
What is the accepted silt content in sand for concreting purpose by volume method?
in m25 concrete what is m.
What is the difference between stress and strength?
where can i get the previous question papers for rrb section enginerr (civil)
What is the difference between lap splice length and development length of rebars?
what is m30 in concrete tiles
0 Answers Interex, Raj Construction, Spago,
Factor of safety for steel should be based on its yield stress or its ultimate stress and factor of safety for concrete should be based on its ultimate stress or its yield stress?
for 16mm thick cement plastring 1:6 on 100 Sq.m.New brick work,the quantity of cement required is.
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)