Answer Posted / engineer
Least count of automatic level is 0.001m or 0.01ft
Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
How much time Required for PPR pipe network testing
Define What are the uses of Groynes?
how to compute slab reinforcements on step by step procedures??
Why we provide hair pin for shed
Which is the most prominent tower of world?
How to activate isometric axes in cad?
What is the Tor steel Consumption for residential building G+24 footing (thum rule) ?
HDPE pipe standard bends using for TSE irrigation? is it possible to use 30 degree?
Describe the advantages and disadvantages of using plastic and timber fenders?
what is work of planning deptt. in any construction compny (in road project)
what is grade intersection?
1. 1. The mass of a chunk of moist soil is 34 Kg and its volume is 0.012 cu. Meter. After drying in an oven, the mass reduces to 14.25 Kg. Determine the water content, the density of moist soil, the dry density, void ratio, porosity and degree of saturation. Take G = 3.25
i have applied 40mm spacer in the concrete for tie beam. is it correct? kindly give me if there any code available
Caching, Multithreading and RAMBUS are 3 methods for resolving the Bottleneck problem. Please give an explanation for each one (how are they resolve the problem?)
What is meant by cartesian coordinate system?