Answer Posted / engineer
Least count of automatic level is 0.001m or 0.01ft
| Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
reinforcement slab, beam and column formulas?
what is right & short method of measurement of slab&beam
How will be cutting in timber plate size 600*400 column size
Why Is Propping Required For Long Structures Once The Form Work Is Removed?
where will be the reinforcement of slab placed when there is an inverted beam and the bottom of the beam and slab are at same level ?
what is m30 in concrete tiles
What is Heavy Concrete & Normal Concrete
Where will be the maximum bending moment in a TEE Beam?
how much need sand and cement for 1 cft roof construction?
what is modular brick and it size
Civil engineering related
What is portland cement
why & what is perchatage we are using fly ash in concrete?
Bearing capacity of soil determined as per ASTM is to design the foundation size.what is the importance of EV1/EV2 value as per DIN .My consultant ask me to test the the soil as per din to find out this ratio to assess the compacted strength of soil ,,?? is it meaning full ??
sir please send me campus placement questions in civil engineering