1) One mason per day how many cu.m work will do as per list
given a) Brick work,hollow brick work and cc block work and
plastering how many m2 per day 2) one carpenter per day how
many m2 will do as well as scaffolding how many m3

Answers were Sorted based on User's Feedback



1) One mason per day how many cu.m work will do as per list given a) Brick work,hollow brick work ..

Answer / sajan

One mason and helper 8 hours minimum 25 sq.m want to do.

Is This Answer Correct ?    16 Yes 40 No

1) One mason per day how many cu.m work will do as per list given a) Brick work,hollow brick work ..

Answer / sunil

One Mason with one helper 20-25 sqm plaster should be finished

Is This Answer Correct ?    14 Yes 55 No

Post New Answer

More Civil Engineering Interview Questions

What is the standard rate of installing ties for column(60cmx60cm) and beams(50x850)(weight)

0 Answers  


We use d*d/162 formula to get the weight value of steel per m, what is 162 in this formula?

2 Answers   L&T,


Explain about Sulphate Resisting Cement ?

1 Answers  


what is water cement ratio m10,m15,m20,m25,m30,m35m ,m40

12 Answers   ACME, bscpl, GKC Projects Limited GKCPL, JK Cement, Ketan Bhatt Commerce Group, Mani Associates, Rain Cements, Ramky, Simplex,


What is the % steel required for a 3x3 slab.

2 Answers  






why loss of strength in concrete in 7 days cube test i am not geting mim 7 days strength that is 67 percent for M-35 and my mix design is perfect there is no doughty,and my results are near to 7days percentage but not 67 percent.

4 Answers   UPPSC Uttar Pradesh Public Service Commission,


iam constructing a new hall of size 21'*14'. we r constructing without columns...i.e only with basement..and constrcting wall thickness of 9" only...can I laid slab on these walls? is it safe?

1 Answers  


how much cement consumption in box type waterproofing

1 Answers  


What kind of soil has what bearin for pile work? eg sand with high water table collapses faster, black cotton soil is ideal, sand leads to more wear and tear of the boring consumables, rock takes longer and require rock augers etc etc

1 Answers   HCC,


In 120 m high RCC Chimney shell construction how we can calculate the inner and outer dia of shell at every +1 m level as this shell is inclined from bottom to top.

4 Answers  


What are the different grades of concrete & their ratios?

3 Answers  


what does 1 in 30 or 1 in 40 mean when constructing camber in roads.

5 Answers   Simplex,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)