1) One mason per day how many cu.m work will do as per list
given a) Brick work,hollow brick work and cc block work and
plastering how many m2 per day 2) one carpenter per day how
many m2 will do as well as scaffolding how many m3
Answers were Sorted based on User's Feedback
Answer / sajan
One mason and helper 8 hours minimum 25 sq.m want to do.
| Is This Answer Correct ? | 16 Yes | 40 No |
Answer / sunil
One Mason with one helper 20-25 sqm plaster should be finished
| Is This Answer Correct ? | 14 Yes | 55 No |
wha is frog?
What is stripping?
how to check the quality of concrete
What kind of soil has what bearin for pile work? eg sand with high water table collapses faster, black cotton soil is ideal, sand leads to more wear and tear of the boring consumables, rock takes longer and require rock augers etc etc
What is the Specific gravity of cement?Water?
What is the strength of Steel Fe 415 and Fe 500
1 Answers Aditya Constructions,
Why curing is necessary for concrete
How many kilograms of sand required in cufic feet for one cubic meter of M25 grade concrete
how many cement bags rquired for solid block construction for 100 sqft in 1:6 proportion?
which grade of cement is more suitable for construction..? and why.?? what is difference between 33, 43 and 53 grade cement..?
Pl let me know approx. Rcc construction cost per sq.Foot for Building a house with2800 sqfeet carpet area in pune city
What is the bowing depth after stressing of PSC Girder of various spans and various dia of strands?
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)