1) One mason per day how many cu.m work will do as per list
given a) Brick work,hollow brick work and cc block work and
plastering how many m2 per day 2) one carpenter per day how
many m2 will do as well as scaffolding how many m3
Answer Posted / sajan
One mason and helper 8 hours minimum 25 sq.m want to do.
| Is This Answer Correct ? | 16 Yes | 40 No |
Post New Answer View All Answers
What is difference between code and standard and specification?
how to caluclate sienerge qty in construction in ap
1.what is the mix proportion for cement soil compressed earth blocks? 2.how to calculate the mix proportion for cement stablised earth soil blocks?
how can we calculate steel value, depending on load
What is the strength of 1:6:12 mix?
What are your goals?
how much of the strength comes from post-production curing
How much permissible bearing capacity requires for open footings(isolated) and what type pile foundatuon prefering for coastal areas?
I want some common questions which have been asked in interviews of NTPC Limited,Satluj Jal Vidyut Nigam Ltd.,and Bharat Heavy Electricals Ltd.
What is the outturn of Ceiling plastering
To pcc 11 ft x 24 ft .How many bags of cement, sand and aggregate required? And for roofing how many cgi sheets required?
Reinforcement details at hinged joint
how many material required for brickbat water proofing of toilets.
In foundation design, while we do the base pressure check, we normally check if the attained pressure value is less than the GROSS BEARING CAPACITY of the soil which is the sum of net bearing capacity of soil and the overburden pressure. Actually, the overburden pressure acts against the net bearing capacity of the soil and I feel that we are actually increasing the bearing capacity value and doing the check. I feel that this is NOT right. Please clarify on this.
I want to know the relevant IS codes of practice which deals with different testings of cement-sand mortar (nominal mix)that is being normally used for brick work or plaster work in the construction work.