1) One mason per day how many cu.m work will do as per list
given a) Brick work,hollow brick work and cc block work and
plastering how many m2 per day 2) one carpenter per day how
many m2 will do as well as scaffolding how many m3
Answer Posted / sajan
One mason and helper 8 hours minimum 25 sq.m want to do.
| Is This Answer Correct ? | 16 Yes | 40 No |
Post New Answer View All Answers
What do you mean by tolerance factor of concrete ?
what is the types of door's wood?
i just want to know how much require sand and cement for 1 sq.mt including wastage. Please guide me as soon as possible.
In jack arch floor, the rise is kept?
howto calculate the quantities of material used in fly ash brick after finding the volume??
Can inverted beams used in pipes during construction?
What is the difference between engineering stress and true stress?
What is meaning of tlc
in the earthquqke the profile of water on dam is parabolic or not
what is pile and deam foundation
IS code for grade of concrete for bamboo lintel????
by which materials we can prepare circular shuttering with tentative cost of material(rate analysis)
How much percentage of brick bats allowed in CD-75 bricks
for Precast foundation howmany days required we can shift the foundation with american Standards i need reference with section any body can help
where can i get the previous question papers for rrb section enginerr (civil)