Answer Posted / maharshi
grades more than M25 should consists of mix designs so for
M30 grade mix design is necessary
| Is This Answer Correct ? | 58 Yes | 15 No |
Post New Answer View All Answers
Labor requirement for each item needed? Lean Concrete 103.550m3 Concrete for Foundation and Structure 1753.000m3 Expansion joint 288.000m Contraction joint 127.000m Dowel bar 450.000m
how clculate excavated or backfilling quantity by simpson's rule
What is the ratio of grades m5, m7.5, m10, m15, m20, m25, m30, m35, m40?
How much for the BRC lapping in full yield and half yield < and which table to get it ?
What tor stands for in tor steel?
rcc floor to floor 4m. in column reinforcement where we provide lap in exact location.
flow of fluid takes place viscosity compressibilityu surface tension deformation under shear force
I am practising engineer. I am searching for tutorial of RCC T Girder design Example in staad pro.Do anybody has this?please help
Critical Path Method is...
Define What is the force exerted by the Tacoma narrows bridge?
how can we calculate steel value, depending on load
What is the largest concrete dam in the world?
A Cat excavator loader of 3Lm*3 heaped capacity bucket is to be used to load blasted rock directly into a crusher of capacity (consumption) of 100L
what is the basic difference between Coloumn & Shear Wall
what will be the cost of thickness of 125mmor rcc measurement of 52x33.75 feet