Answer Posted / sandeep kumar
m30=1:1:1
| Is This Answer Correct ? | 9 Yes | 7 No |
Post New Answer View All Answers
Q 1) 1 Mason and 2 LABOUR / _________CUM brick work Q 2) 1 Mason and 1 LABOUR / _________SQ FT Plaster work Q 3) 1 Carpenter & 2 Labour/_________SQ FT shuttering work Q 4) 100 SQ FT roof slab concreting ____________mason and labour required
For submitting the project loan for bank Residential bldg,Suppose we take Provinding RCC mix 1:2:4 for footings No of footings,length ,Breadth,Height ,qty in cum, at last unit/Rate(Rs) ,i would like to know how do we get the unit/Rate
Define What is an ice dam sock?
What are the strongest shapes in building?
What is the use of water table & Kreb stone for drain
Why we provide hair pin for shed
what is the soil bearing capacity for a 5 floor multistorey residential building and which type of soil ? what is plinth beam? in wall load calculation center to center column distance is considered or not/
explain the advantages of total stasion
Find out Cutting Length of Steel for Right angle Triangle? Where Opposite Side 4m, Adjacent side 6m. (Assume cover 40mm)
types of piles detail,
what is the list of building construction equipment & teir output?
What distance in meters on the ground is the equivalent of one second of arc in longitude or latitude?
What are the responsibilities of a construction manager?
What is the density of DLC & PQC and how it is differ from normal concrete?
which is the cheapest type of flooring (say for using for 6 months in a factory building & dismantling it)?