Answer Posted / soumya
Cement = 7.5 bags ( as per the cement content given 375
kg/m3)
sand content =0.45 m3
aggeregate =0.92 m3
| Is This Answer Correct ? | 19 Yes | 19 No |
Post New Answer View All Answers
how many minimum admixtures are used in water froofing structures
Mention different types of roof systems?
Design a built-up column carrying an axial load of 1200 KN. Its length is 8m and it is effectively held in position at both ends and restrained against rotation at one end. Assume yield stress of 250 mpa
What is oneside mat. And explain
what is the procedure of wet seiving. n percentage of silt in different type of soil?
what motivates you to do a good job
how many digree of freedom in four bar chain
asubmerged weir is one in which the water level on the down stream side of the weir is just at the crest level below the crest level above the crest level at stamp elevation as water surface on upstream
how to calculate the chair reinforcement length in slabs, footing or anywhere??
3. What are the disadvantages of your present job, things you do not like about it?
foundation details for 25 ton weight Furnace on 2 supports and 2 tilters
how do you calculate the length of "L" of main & distribution bar for reinforcing of raft footing
what are the duties of Site Engineer in work site?
Hi.. Can i get hel in finding HPCL previous year question paper? plz help me in finding thiss..
can we compare the combined core of DBM and BC density with average density of Lab DBM and Lab BC density