when we start the tube light, then it takes initially 1100
volt, after glow it takes 120 volt?(when we give 220 volt a.c.)
Answers were Sorted based on User's Feedback
Answer / prakash gokhale
Normally bulb or tubes are filled up with some gases.
deionisation of such gases gives the light as a product of
collidation of gas particles. But for that deionasation
high energy is required and we use choke for the same.
Choke is a inductive device which takes more power for
starting.
| Is This Answer Correct ? | 2 Yes | 0 No |
Answer / pritish
at the initial stage the voltage induced by the choke is nearly about 2000v due to the inductive property of choke and this high voltage is required to discharge the gasses from the filament of the tubelight. after the discharge id initiated it requires normal supply voltage to maintain the path for the gasses inside the tube.
| Is This Answer Correct ? | 1 Yes | 0 No |
Answer / amarnath
In a Tubelight we have a Choke which is made of Copper or
aluminium coil and when power is supplied this choke acts
as an inductive load and for inductive load initial voltage
required to start is more hence it is so.
| Is This Answer Correct ? | 0 Yes | 0 No |
give me list of material for wiring of 20hp motor?
r we are using in gas turbine mark (5) frame (6) (made in india Bhel 1997) Ā
how capacitor buield up the voltage
In view of Electrical Engg. What is the use of SCR(Silicon control rectifier)
how harmonics generated in induction furnance? how minimise it?
How can we calculate the resistance of earthing & how can we control it?
what is the calculation of power factor?
Can I do body earthing of machine by using Cable armour or I have to run another GI wire for body earthing and how many wires I need to run. Is there any rule for this. eartnig
in transmission line, if the load is suddenly increased at the receiving end of the system the phase shift will (a)decrease (b)becomems zero (c)increase (d)not be affected
how make megger test for control cable like 12c x 1.5mm and what it apply voltage and test timing details.
WHY IS THE SIZE OF HOLE OF THE EARTH POINT IN THE PLUG POINT BIGGER THAN PHASE AND NEUTRAL
what is the difference between control transformer and Potential transformer (PT)?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)