when we start the tube light, then it takes initially 1100
volt, after glow it takes 120 volt?(when we give 220 volt a.c.)
Answers were Sorted based on User's Feedback
Answer / prakash gokhale
Normally bulb or tubes are filled up with some gases.
deionisation of such gases gives the light as a product of
collidation of gas particles. But for that deionasation
high energy is required and we use choke for the same.
Choke is a inductive device which takes more power for
starting.
| Is This Answer Correct ? | 2 Yes | 0 No |
Answer / pritish
at the initial stage the voltage induced by the choke is nearly about 2000v due to the inductive property of choke and this high voltage is required to discharge the gasses from the filament of the tubelight. after the discharge id initiated it requires normal supply voltage to maintain the path for the gasses inside the tube.
| Is This Answer Correct ? | 1 Yes | 0 No |
Answer / amarnath
In a Tubelight we have a Choke which is made of Copper or
aluminium coil and when power is supplied this choke acts
as an inductive load and for inductive load initial voltage
required to start is more hence it is so.
| Is This Answer Correct ? | 0 Yes | 0 No |
fuel-air ratio in a petrol engine fitted with suction carburettor,operating with dirty air filter as compared to clean filter will be
IS THE ANY DIFFERENCE B/W GENERATORS & ALTERNATORS
why voltage form factor of PT are increase , when it is ecpected heigher spikes in system. how it is calculated.
The objective of connecting a resistance and capacitance across gate circuit is to protect the SCR against
how can we connect a distance relay to CT core that is for backup protection or metering?
what type of relays used in transformers?
-----------means a source which can supply a constant voltage to aload irrespective of the valu of load resistance.
What do you mean by pf of a generator? Power factor purely depends on the load (wether inductive, reactive or unity) then what does the pf mentioned on the generator nameplate means?
Whether earthmat designning is done only for sub station or it can be done for multy residential complexes also? What is the size, type & arrangement of the earth grid to be done?
hey guys i scored 910 on GRE and 67 on TOEFL respectively.I have an aggregate of about 74%in my B tech.For which colleges should i apply for an MS program in electrical engineering.I am looking for colleges in NJ,SC,NC,GEORGIA, NY. Please reply with a good response.....
what is the difference between changer, converter and transformer?
Is there a standard depth of gravel fill in Substation Switchyard? Please give a design/drawing. Thank you.
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)