Answer / harshitha
The velocity of with which the approaches or reaches the weir or notch before it flows over it.
| Is This Answer Correct ? | 28 Yes | 10 No |
Answer / sparsh jandial
It is the velocity at which two objects move towards or away from each other.
If objects are moving towards each other than Velocity of approach is turned positive or else negative.
| Is This Answer Correct ? | 12 Yes | 2 No |
Answer / garima sawhney
Velocity of approach may be defined as the velocity with which water in the channel approaches the weir before it flows over it.
| Is This Answer Correct ? | 2 Yes | 0 No |
Answer / zia ullah
The average velocity of water in a channel at the point where the depth over a flow measuring weir is recorded.
| Is This Answer Correct ? | 4 Yes | 6 No |
Answer / abid hussain
It is the velocity of fluid reaches the weir or notch before flows over it
| Is This Answer Correct ? | 8 Yes | 11 No |
Answer / hemant
it is the rate at which the separation between two moving particles decreases
| Is This Answer Correct ? | 11 Yes | 15 No |
Answer / sajjad
when any fluid has an obstruction while it is flowing then
there is some rise w.r.t previous level i.e vel. approach
| Is This Answer Correct ? | 10 Yes | 25 No |
what is the dimensions of river sand truck trailer or trolly ?
what is detail procedure of eccentric footing? plz. give solved exmple?
PCC Road Min Grade M 30 for VR standard Mahatashtra load 30 KN. what should be thickness of pavement, width 4m what should be length of panel.
Describe the sections included in a typical bill of quantities
What is the cement and sand consuption of 1:4 block work
what is the shuttering normal clear cover for footings, walls, beams & columnms
we want build 10ft height ,tostore 4 litresof water.what is theground basement for steel andcement andsand.please send us basment calculation?
Why is cover provided in beams, slabs, lintels, columns, etc ? What is the drawback of not providing cover in the same?
How Can I know the wastages(%) of each work added in estimating the quantity of construction materials?(Eg. Ceiling Work, Brick Work,etc....)
convert 1cum how many kilo
what is the weight of a cubic meter of M10 concrete?
225 mm thick RCC slab, how many ton load slab can carry? for example if 33 ton truck loaded with soil, truck having 6 wheels. slab can take load or not? grade of concrete is M35 and slab design Fe500, slab desing one way slab.
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)