Answer Posted / hemant
it is the rate at which the separation between two moving particles decreases
| Is This Answer Correct ? | 11 Yes | 15 No |
Post New Answer View All Answers
if i have to draw bending moment diagram of 4 way continous span then how to create it and how to find reaction?
do we decide reinforcement steel , based on bending moment ? give example with continous slab?
i have span of 6m x 4m how do i calculate the reinforcement of steel i needed and to at what distance and also the thickness of slab. looking forward thank you RAVI
The building has 12 columns of 12x9 in 3 rows of 4 each in a plot of 50'x30', The central row is strengthened with 16mm twisted rods. The roof area is 1500 sft including balconies. calculate the load factor per sft. Also indicate the number of roofs the building can withstand.
what is the tensile strength of 10swg and 8swg gabion wire?
Minimum and maximum size of the building components
if a pipe those configuration (ASTM c 76 class b 450mm dia 2500mm length) fixing for water course those lining of water is 7000 running meter. my question is that if 8 joints of pipe ls leakage and we have not permission to stop the water so which treatment we apply on joint in that in condition.
I am a civil engineer . I am also selected for sbi clerk interview which is to be held on 4th May2010 is there anybody resembling the same? what question can be asked and what should be the probable answers?
How do we test on design and style in a software?
How can explode a block?
in staad ,why we realease a moment of a member ? what is affect if we realease a moment
How do You Maintain a structure after getting cube test of low strength.
How much river sand contain the 6 & 10 wheeler truck? Or Maximum sand that any type of truck carry?
Can you pl explain the procedure steps of singly and doubly reinforced beams in limit state method
how to convert sand in Cft to Kgs