Answer Posted / garima sawhney
Velocity of approach may be defined as the velocity with which water in the channel approaches the weir before it flows over it.
| Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
Howmuch bend to be provide for 200/600 BEEM
What are the phases inspections are done by local authority while construction?
Rate analysis of Vitrified tile in cement mortor 1:3
column at edge of a framed structure is uniaxial or biaxial. and is an interior column is biaxial
from one meter cube of stone masonry structure how much cubic meter of cement mortar we use as our estimation 25-30% is that correct for estimation of quantity of sand and cement(2:1) proportion of mortar
how to calculate detail quantity of bricks and mortar for 500 cu.ft masonry work. consider wall thickness 9 inches
Process of pcc in wateredug
plz drive the formula d2/162.162 for the calculation of weight of steel bars????
please briefly explain calculating or estimating steel quantity for a RCC column?
How much cement and sand are required for 1 square feet of plaster at a thickness of 15 mm at a ratio of 1:4?
I am called for interview from north east power plant .so, I need some interview question which may help me.
Can compresive strength test for concrete at 1 day age possible to carry out? If yes, which IS code describes the procedure for such testing?
1.what type of the rock is most suitable for wet mix macadam in construction of road? 2.what is the highest maximum dry density and optimum moisture content can be acheive by using most suitable crush rock?
residential buildings,mixing of concrete,structural,construction material,site handling.
How much percentage of brick bats allowed in CD-75 bricks