Answer Posted / abid hussain
It is the velocity of fluid reaches the weir or notch before flows over it
| Is This Answer Correct ? | 8 Yes | 11 No |
Post New Answer View All Answers
Please send me the qunty. of mason/labour required in each day for different type of civil construction work?please send me ans. in my mail.my mail id is (parthamitra086@gmail.com) or here.
What is the absolute pressure scale?
What happens when water mixed with cowdung is used for priming instead of water for lifting water in pumps?
A doubly reinforced concrete beam is 25 cm wide and 50cm deep to the centre of tension reinforcement. The centre of compression is steel is 5cm from the compression edge. The areas of the compression and the tension steel are 10.16cm2 and 12.56 cm2 if m=18 and the bending moment at the section is 7,000,000 N-cm. Calculate the stress in concrete and steel.
how can calculate the compressive strength of concrete cylinder by water cement ratio ?
What is a kip?
how to decide the mortar ratio 1:4,1:6 in masonry? same in plaster 1:3 and 1:4? which code or any document reference taken to define proportion?
which formula used for calculate the area of segmental arch?
How to calculate quantity of cement , sand and granite from concrete mix ratio and volume of work
what is the productivity in aluminium shuttering per day
how will calculate 4"thick solid block quantities 1m3 sand cement ratio and breack up detail
where can i get the previous question papers for rrb section enginerr (civil)
how to create our resume?
what discoveries did you have in relation to your course?
how to balance aggregate during mix design of concrete???? how to calculate moisture content like C/A,F/A and how many percentage using ice instead of water for example of we are preparing ice concrete??????