In your experience what is the maximum beam length. What's
beam size and also please provide column size also. Thanks.
which red: used in roof teping, then use only cement
Hi, Please tell me the ISI specification for the duration of concrete to achieve full strength of concrete. Is it 28days?
please know me that required quantity of cement , sand , water and bricks for 1 cub meter of brick work
Cube tests of concrete are failed at 7 days and 28 days.What is your next action?
how will remove spiderweb cracking in plaster ? what the reasone of make it ?
how many BSCs can i connect to the HUAWEI MSC
Management diagram of your project isβββ
What is mean by ITP in a construction project
the beam size (450x1000) effective length is 19.0mts no intermediate supports and top 8nos 32dia and bot 32dia and condition is stragge lap. it is exceeding lap zones and exceed length of bars?
to draw bm diagrams for portal frames under different loadings//
how to take the quantity of block work and plastering 1block price:3saudi riyal cement:1bag:15 saudi riyal sand:3bag:20 saudi riyal 1mason:9hour per hour 40 saudi riyal 1labour:9hour per hour 40 saudi riyal can anybdy calculate
How much for the BRC lapping in full yield and half yield < and which table to get it ?
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)