Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


Explain the difference between slab and beam?



Explain the difference between slab and beam?..

Answer / syed mubashir

A slab is a flat, horizontal structural element that forms floors or ceilings, while a beam is a horizontal structural element that supports loads from slabs and transfers them to columns.

Is This Answer Correct ?    0 Yes 0 No

Post New Answer

More Civil Engineering Interview Questions

What is c.g.i sheet which used for roof??

0 Answers  


i just want to know how much require sand and cement for 1 sq.mt including wastage. Please guide me as soon as possible. 

0 Answers   bsmcpl, L&T,


What"s mean by water bound macadam road(WBM)?

11 Answers   Simplex,


What is passive earth pressure ?

0 Answers  


How many cncrete grades are used for construction,explain with proportion,grades and where it used

4 Answers   Unicel,


curing of concrete why 7day's,14day's 21day's 28days

5 Answers   Gammon,


how amny bricks of size 240 mm X 120 mm X70 mm are required in 100 cubic meter brickwork. How much cement is required at 10 mm masonry and at 4:1 sand cement ratio and how much cubic meter of sand is required for the above work.

2 Answers   Cube Construction,


What is Aggrgate sizes used in a WMM Plant?

3 Answers   Black Stone,


what is diff between auto level and dumpy level?

4 Answers   ABB, L&T, NCCL,


how do we calculate quantity of gypsum for 1m3? 1m3 = ?kg

2 Answers  


How to calculate the amount of Brick,cement & sand required for 1 cum of 230mm thick brick work with ratio 1:5 please give me an answer with detailed step

31 Answers   Assurance, Design Ideas, Jeno Maran Builders, Lanco, NamPower, NCC, Prime Adhivas Contrats, Simplex, SSM, SSM Builders and Promoters,


What is meant by struct column And stub column

3 Answers   L&T, Shoba Devlopers, TATA,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4453)
  • Electrical Engineering Interview Questions Electrical Engineering (16638)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)