Answer / siva rami reddy
Hi,
Question is not correct. RCC or PCC cost will be depending
upon the grade of concrete. If PCC is M10 (1:3:6) and if it
RMC (Ready Mix Concrete) cost will be about 3500 Rupees per
Cum and RCC of M20 or 25 cost may not differ much may be
around 4250 more or less. Brick cost will 3000 Rupees per
Cum.
| Is This Answer Correct ? | 90 Yes | 18 No |
Answer / vignesh
p.c.c & r.c.c mix ratio is not given.in case p.c.c m10 &
r.c.c m20. the rate will be changed from site condition and
sorrunding the area how much cost price in raw materials
which type of cement we will used in r.c.c & p.c.c
| Is This Answer Correct ? | 31 Yes | 2 No |
Answer / aparajita swain
Rate of RCC (M20) (Foundation) = 4900 / cum
Rate of PCC = 3500 / cum
Brick work = 450/ Sqm
| Is This Answer Correct ? | 46 Yes | 18 No |
Answer / vkg
cost of M30 (RMC) = [2700 + cost of cement]/cum
generally 1 cum contained 8 to 11 cement bags
| Is This Answer Correct ? | 29 Yes | 19 No |
Answer / ehaque9499
If PCC is M10 (1:3:6) cost will be about 3000 Rupees per
Cum and RCC of M20 or 25 cost around 4500. Brick cost will
be depend upon brick rate if brick Rs 3 per no. then cost
3000 Rupees per Cum.
| Is This Answer Correct ? | 22 Yes | 14 No |
Answer / p jagan
Rcc 1cft rate is 250/- in kurnool I want PCC rate 1 4 8ratio
| Is This Answer Correct ? | 5 Yes | 0 No |
Answer / rajeeb lochan rout
If PCC is M10 (1:3:6) cost will be about 3500 Rupees per
Cum and RCC of M20 or 25 cost around 4800. Brick cost will
be depend upon brick rate if brick Rs 3 per no. then cost
3200 Rupees per Cum.
| Is This Answer Correct ? | 14 Yes | 10 No |
Answer / mohd abdul raheem
Sir I want to know how much charge for RCC slab area about 1100 sqft ready mix concrete
| Is This Answer Correct ? | 1 Yes | 1 No |
Answer / nobika mano
PCC for M10 = 7400/cum
Footing RCC for M40 =10500/cum
| Is This Answer Correct ? | 0 Yes | 0 No |
Differentiate orthographic and isometric projections?
What is the role of a PMC(project management consultancy) in any construction work?
for assembly supported beam main bar are provided at ?
Why are L-beams (cast monoloithic with slab)that usually occur at the slab edge, provided with overhangs?
Explain what is 1/8 on the architect ruler denotes?
What is the basis of choice for cement sand plaster in ratio 1:4 and 1:6 on interior walls of a residential apartment.
what bending moment?
How much steel required for 1000 sq ft slab 4" thickness.
how much cement is required for 3200 sq ft of roof
How do you determine or evaluate success?
what is the productivity in aluminium shuttering per day
wat is six sigma course ? is it good for civil engineers . wat is pmp certification ? is it good for civil engineers .
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)