Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


plz give me the rate of RCC(1cuM), PCC(1 cuM), Brick Work
(1sqM)?

Answers were Sorted based on User's Feedback



plz give me the rate of RCC(1cuM), PCC(1 cuM), Brick Work (1sqM)?..

Answer / siva rami reddy

Hi,
Question is not correct. RCC or PCC cost will be depending
upon the grade of concrete. If PCC is M10 (1:3:6) and if it
RMC (Ready Mix Concrete) cost will be about 3500 Rupees per
Cum and RCC of M20 or 25 cost may not differ much may be
around 4250 more or less. Brick cost will 3000 Rupees per
Cum.

Is This Answer Correct ?    90 Yes 18 No

plz give me the rate of RCC(1cuM), PCC(1 cuM), Brick Work (1sqM)?..

Answer / vignesh

p.c.c & r.c.c mix ratio is not given.in case p.c.c m10 &
r.c.c m20. the rate will be changed from site condition and
sorrunding the area how much cost price in raw materials
which type of cement we will used in r.c.c & p.c.c

Is This Answer Correct ?    31 Yes 2 No

plz give me the rate of RCC(1cuM), PCC(1 cuM), Brick Work (1sqM)?..

Answer / aparajita swain

Rate of RCC (M20) (Foundation) = 4900 / cum
Rate of PCC = 3500 / cum
Brick work = 450/ Sqm

Is This Answer Correct ?    46 Yes 18 No

plz give me the rate of RCC(1cuM), PCC(1 cuM), Brick Work (1sqM)?..

Answer / vkg

cost of M30 (RMC) = [2700 + cost of cement]/cum
generally 1 cum contained 8 to 11 cement bags

Is This Answer Correct ?    29 Yes 19 No

plz give me the rate of RCC(1cuM), PCC(1 cuM), Brick Work (1sqM)?..

Answer / ehaque9499

If PCC is M10 (1:3:6) cost will be about 3000 Rupees per
Cum and RCC of M20 or 25 cost around 4500. Brick cost will
be depend upon brick rate if brick Rs 3 per no. then cost
3000 Rupees per Cum.

Is This Answer Correct ?    22 Yes 14 No

plz give me the rate of RCC(1cuM), PCC(1 cuM), Brick Work (1sqM)?..

Answer / ghantola

The price/rate will depend on grade of materials used and geographical location.

Is This Answer Correct ?    9 Yes 2 No

plz give me the rate of RCC(1cuM), PCC(1 cuM), Brick Work (1sqM)?..

Answer / p jagan

Rcc 1cft rate is 250/- in kurnool I want PCC rate 1 4 8ratio

Is This Answer Correct ?    5 Yes 0 No

plz give me the rate of RCC(1cuM), PCC(1 cuM), Brick Work (1sqM)?..

Answer / rajeeb lochan rout

If PCC is M10 (1:3:6) cost will be about 3500 Rupees per
Cum and RCC of M20 or 25 cost around 4800. Brick cost will
be depend upon brick rate if brick Rs 3 per no. then cost
3200 Rupees per Cum.

Is This Answer Correct ?    14 Yes 10 No

plz give me the rate of RCC(1cuM), PCC(1 cuM), Brick Work (1sqM)?..

Answer / mohd abdul raheem

Sir I want to know how much charge for RCC slab area about 1100 sqft ready mix concrete

Is This Answer Correct ?    1 Yes 1 No

plz give me the rate of RCC(1cuM), PCC(1 cuM), Brick Work (1sqM)?..

Answer / nobika mano

PCC for M10 = 7400/cum
Footing RCC for M40 =10500/cum

Is This Answer Correct ?    0 Yes 0 No

Post New Answer

More Civil Engineering Interview Questions

How much snowcem required per sq. Meter area

3 Answers   Bhushan Power Steel,


Providing and constructing 150 mm thick brick masonry with brick in cement mortar ( 1:4 ) in partition walls, pilars, pedestals,supports etc. at all floors including RCC band at 1.0 M intervals, including scaffolding racking out joints and watering cleaning complete in sqm. Providing and constructing 230 mm thick brick masonry in Cum Providing and constructing 460 mm thick brick masonry in Cum Please provide me the rates..

1 Answers  


What are the types of test used to determine soil bearing capacity

5 Answers  


what is the name of shuttering oil used in oman

0 Answers  


volume of one cement bag

4 Answers   Grand Peaks, Omace, Swasudha Infra,


If u want ur Ans.Of any Question so mail me skatiyar011@yahoo.in

0 Answers  


why development length = 50D . why not 100D

0 Answers  


  what is purpose of PCC  Below Footing ?

5 Answers   Vistacore,


how can i test sand on field in lebortry?.

4 Answers   ECCI,


how to caliculate required amount of cement and sand required for 1cu.m.

0 Answers   Allied Group, L&T,


What is the lap lenth for welded joints for reinforcement bars. and what is its IS code no.

5 Answers  


How to calculate strirubs hook length? one of my friend said unit of steel*dia of steel*no of bend=hook length is correct r wronge

3 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4453)
  • Electrical Engineering Interview Questions Electrical Engineering (16638)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)