plz give me the rate of RCC(1cuM), PCC(1 cuM), Brick Work
(1sqM)?
Answer Posted / ehaque9499
If PCC is M10 (1:3:6) cost will be about 3000 Rupees per
Cum and RCC of M20 or 25 cost around 4500. Brick cost will
be depend upon brick rate if brick Rs 3 per no. then cost
3000 Rupees per Cum.
Is This Answer Correct ? | 22 Yes | 14 No |
Post New Answer View All Answers
i have to give lap joint fo 1Mtr steel of dia12mm,whenever i did mistake i cut less 5cm plz tell me how much i will give lap joint so that length comes 1Mtr
What do you mean by honeycomb in concrete?
what is your role of in previous company as a construction manager
Prepare a Schedule for a Highrised building from starting stage to Handover?
Why are steel plates inserted inside bearings in elastomeric bearing?
If u want ur Ans.Of any Question so mail me skatiyar011@yahoo.in
in plate load test what is the thickness of plate 20mm 5mm 50mm none
What are the responsibilities of a construction manager?
At what point does a circle start losing area when being flattened?
I am called for interview from north east power plant .so, I need some interview question which may help me.
what is the basic difference between Coloumn & Shear Wall
. Write a C program to perform following functions:- a. Declare one integer variable of all the storage classes. b. Print all the variables without assigning any values in tabular format. a. The tabular format must contain the variable name, type, storage class and printed value on the screen in RED color.
What are the points to be considered for calculating cement reconciliation. a)Do we need to deduct the wt of cement bags b)Do we need to adjust the qty due to wt loss during transportation, loading unloading etc or else each bag can be considered as 50 kg bag c)What is the proportion of mix cover block making.
What is made from large rocks, which protects the base of cliffs?
Define What is a kip?