plz give me the rate of RCC(1cuM), PCC(1 cuM), Brick Work
(1sqM)?
Answer Posted / rajeeb lochan rout
If PCC is M10 (1:3:6) cost will be about 3500 Rupees per
Cum and RCC of M20 or 25 cost around 4800. Brick cost will
be depend upon brick rate if brick Rs 3 per no. then cost
3200 Rupees per Cum.
Is This Answer Correct ? | 14 Yes | 10 No |
Post New Answer View All Answers
How to calculate the area of a irregular sized land in square feet?and what will be the total area of this land South-51.1ft , North-47.7ft , East-53.3ft , West-54ft ?please explain me how to calculate?
how clculate excavated or backfilling quantity by simpson's rule
design the irrigation canal(b,B,h )head is 3tms of water is supplied to the 200hectars of area and the base period crop is 150days dance to water travels as 35km.the canal section is trapezoidal and also calculate the slop the canal
What is meant by engineering drawing?
Why M15 is replaced by M20 when ammendment are made in IS456 in 2000?
I want to know how much the lapping length for the pilecap reinforcement.. we r using single pile cap which is 24mby54m and 2.5m depth.. total 91piles are supporting the pile cap.. how to do a steel reinforcement??
What is the difference between Hinged and pinned in Column ends
how much of the strength comes from post-production curing
how to identify the failure of building by expansive soils
In tower foundation, on the time of 3 mtr pit RCC casting if water and mud is their surface of PCC then what will be do?
hai, kindly send anyone for output workers format details for construction project in foundation to finishing.
please send me bhel questions on rupesh.017@rediffmail.com
How to calculate woden area in sft and Cft
how to calculate load for a bungalow and 1column carry how much load if the size of column ,9"*15" .....or total structure load......
Why is concrete cube test carried out?