plz give me the rate of RCC(1cuM), PCC(1 cuM), Brick Work
(1sqM)?
Answer Posted / siva rami reddy
Hi,
Question is not correct. RCC or PCC cost will be depending
upon the grade of concrete. If PCC is M10 (1:3:6) and if it
RMC (Ready Mix Concrete) cost will be about 3500 Rupees per
Cum and RCC of M20 or 25 cost may not differ much may be
around 4250 more or less. Brick cost will 3000 Rupees per
Cum.
| Is This Answer Correct ? | 90 Yes | 18 No |
Post New Answer View All Answers
How to calculate the cement and fine aggregate requirement for solid block masonry works in terms of Sqm. 1. 400x200x200mm 2. 400x200x100mm 3. 600x200x100mm 4. 600x200x200mm I need the answer for 1 Sqm of solid block works.
what is the quantity of block work required to construct a compound wall of 6" thick,and 212 lenght
Differentiate first angle & third angle projection?
give me the rate analysis for Bituminous Macadam and SDBC
What is meant by scaffolding coefficient?
what happening if we casting HV shunt reactor foundation pad at 50cm height different time (One day difference)
How you can use different dimension tools in cad? What are the different dimensions available?
how to clculate the %of concrete strenght achive after curing?load
What is the use of extruded feature in solidsworks?
60-70 grade of Bitumen is VG-30 ?
what is the breaking strength of wall tiles
Why are steel plates inserted inside bearings in elastomeric bearings?
How to calculate plastering for elevated water storage tank
if 20mm aggregate is coming by weight 25 ton in a 10 wheeler hywa ,then what will be total volume of aggregate in cubic feet.
Requirement of cement, and steel 1:2:4 ratio concrete in 1128 Sqft area(Cement No of bags, steel in Kgs)