plz give me the rate of RCC(1cuM), PCC(1 cuM), Brick Work
(1sqM)?

Answer Posted / siva rami reddy

Hi,
Question is not correct. RCC or PCC cost will be depending
upon the grade of concrete. If PCC is M10 (1:3:6) and if it
RMC (Ready Mix Concrete) cost will be about 3500 Rupees per
Cum and RCC of M20 or 25 cost may not differ much may be
around 4250 more or less. Brick cost will 3000 Rupees per
Cum.

Is This Answer Correct ?    90 Yes 18 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

how to preaper for interview wat they asked in interview give me idea

2176


Define What are the uses of alloys in daily life and how are alloys made?

736


hi, i am appearing in HPCL(CIVIL ENGG.)exam. plz send me placement paper of this exam if u are having

2041


As we know that steel is a tension member but why we are using STRUCTURE STEEL as a COLUMN (Without concrete) where column is a compression member and compression strength of steel is very low

1069


give me the rate analysis for Bituminous Macadam and SDBC

6947






how ratio is calculated for any grade of concrete. for e.g. sppose M20 requires(x;y:z) quantity of cememt sand and aggregate.

1569


What is the strength of 1:6:12 mix?

2600


 rcc floor to floor  4m. in column reinforcement where we provide lap in exact location.     

1488


What is quantity of cement and sand required for 2000sqft of tiling?

2393


How to arrive the co- efficient of all civil activities? For ex:- painting-enamel in wooden doors. co efficient is 1.8. How this is calculated

1700


what is conventional shuttering rate per square feet of built up area? what is Mivan shuttering rate per square feet of built up area? what is coupler shuttering rate per square feet of built up area?

4464


How can calculate the requirement of steel bars of rcc slab for 1100 sq ft?

1490


What goals do you have in your career?

1696


which software is better for design and analysis of buildings (stadd pro ) or (Etabs)

1837


what is the design procedure for building

1763