1.how to calculate the nails qty in shuttering of column,beam, shear wall. 2.how control the binding wire wastage in building project. 3.
1 10363Please tell me Detail cost of providing& laying nominal mix design 1:2.5:5,40mm nominal size.curing complete e/c cost of form work in foundation and plinth i/c carriage.
2298HOW to calculate Rate analysis of M15 GRADE DESIGN MIX RATIO 1:2.5:5 WITH 40MM Size aggregates for 1 cumtr.
2 27457if dia of inner circle is 42 m and depth is 1.5 m and width is 1 m ,then whait is the quantity of steel?
1 2868what is the average steel consumption in multy storey building as a residential and commercial?
6 15396How much quantity of cement and sand required for the inlining of 610mm dia MS pipe 8.7mm thk.Inlining thickness is 10mm and CM ratio is 1:1.5.
1 4260What is approximate % of wastage considered for Marble and vitrified tiling works (flooring)?
3 14256we want build 10ft height ,tostore 4 litresof water.what is theground basement for steel andcement andsand.please send us basment calculation?
BBCL,
1 2418What is the volume of sand in per cubic meter if we have a design mix of concrete is 1:2:4 (by volume).
5 8581consumption of cement in p.c.c. a. mix. 1:1:2 b. mix. 1:1.5:3 c. mix. 1:2:4 d. mix. 1:3:6 e. mix. 1:4:8
MSPL,
2 6486Post New Civil Engineering Questions
please send me bhel questions on rupesh.017@rediffmail.com
pls mail some more tecnical qustions at msaranya2610@gmail.com
Kindly post me previous year interview questions with answer for post of DY. Manager (civil engg.) for GAIL, NTPC, IOC, OIL and ONGC etc.
Please tell me Detail cost of providing& laying nominal mix design 1:2.5:5,40mm nominal size.curing complete e/c cost of form work in foundation and plinth i/c carriage.
can you mail me detailed procedure,entire syllabus and practice papers of mpsc civil engineering branch.I am in third year now
400 ku d/c clearess ketan hota hai?
Please send me the qunty. of mason/labour required in each day for different type of civil construction work?please send me ans. in my mail.my mail id is (parthamitra086@gmail.com) or here.
I need to constructive work in amaraj batteries
can any one give me sample question paper of BHEL at mdansari86@gmail.com as i m appearing for the same exam.
In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting? 2nd :- I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
what is the 0 value in quantity surveying
kindly mail me by attaching files , formats for quality checks of common building materials like cement , concrete , bricks , sand and aggregates plz send my email id- VMANDAL91@gmail.com
plz.show development and anchorage length in simple diagram.
VAT and CST ? Which benefits for buyer ? Why benefits?
cud any one send me tech quest paper(civil engg) at tarizus@yahoo.com