what is the percentage of Fly Ash content in cement and in
concrete?
Answers were Sorted based on User's Feedback
Answer / er. shivam dixit
89 kg needed to add fly ash in one cubic meter concrete
| Is This Answer Correct ? | 2 Yes | 2 No |
the internal dimensions of a ware house are 15m *5.6m and the maximum height of piles is 2.70m find the maximum numbers of bags to be storedin two piles
Rigid pavement Load in tyre preesure It Means KG
within an emergency scenario what are the safe systems of work a coss can setup as part of is duties
how to prepare site mix design
The point of contraflexure occurs in
standared weighs for differnt grade of concrete
what is the calculation of raw material for 0.35cum of m-15
The 4 main factors to start a construction project are––
How many square meter can mason layout chb per hour
How to calculate the crank rod in slab
0 Answers Bridge and Roof, Krishna Constructions,
which one is strong? field weld or shop weld?
how to calculate the wind pressure
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)