What is approximate % of wastage considered for Marble and vitrified tiling works (flooring)?..

Answer / raj

5%

Is This Answer Correct ?    11 Yes 3 No

What is approximate % of wastage considered for Marble and vitrified tiling works (flooring)?..

Answer / mahalakshmi

how?

Is This Answer Correct ?    0 Yes 0 No

What is approximate % of wastage considered for Marble and vitrified tiling works (flooring)?..

Answer / vijay

Practically depend upon pattern and cut length 5% to 8%

Is This Answer Correct ?    1 Yes 1 No

Post New Answer

More Civil Engineering Interview Questions

What is Refuse Area In High Rise Building ?

1 Answers   Arpee Group,


How many are the types of joints?

1 Answers  


toothpaste is non-newtonian or newtonian

1 Answers  


how much concrete solid/hollow block are manufacture per 50 kg cement bag in differnent sizes like 400x200x200mm, 400x200x150mm, 400x200x100mm. And need proper ratio as per sale quantity. pls send my mail mathi7599@gmail.com searching last two years not yet get pls find and enclosed pls. need practical analysis.

1 Answers  


Pile height is 4.3m. 2nos. under reammer. bulb nose is 75mm and height is 400mm. pile dia is 375mm and overall dia 940mm.pls. help to calculate concrete in pile and bulbs separately. What is formula for bulb volume calculation ?

1 Answers  


Can we weld hot rolled steel ASTM A615 ? Please Give the detail answer please thanks alot

1 Answers  


Any strength is a stress but any stress is not strength

1 Answers  


What are some facts about concrete?

1 Answers  


how much % of cement can be replaced by flyash ....

4 Answers   L&T,


WHAT IS YOUR FUTURE PLANS FOR THE COMPANY IF PERMANENTLY EMPLOYED

4 Answers   Oil and Gas Jobs,


How to calculate the force on a column of three story building. What should be the base concrete height?.

1 Answers   C&C,


Before casting a basement roof slab which is connected with retaining wall surcharge load (i.e. sand or earth filling) outside the retaining wall is prohibited because of––

1 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4453)
  • Electrical Engineering Interview Questions Electrical Engineering (16638)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)