Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...



Engineering Interview Questions
Questions Answers Views Company eMail

in power station power measuring unit is KW but in transformer is KVA why?

4 7279

what is mean by busbar and what is the difference between busbar,transmissionline,feeder,distribution line

5731

I hv a question regarding power factor improvement just after transformer. I request you to reply me plzz. thank you sir. My friend has a small unit of fabrication. in his factory the main load is a welding machine, lathe machine, grinding machine. this load is not continuous type. now our electricity board has installed 16 KVA, 11000/433 V transformer for our factory. In the energy meter (trivector meter) at LV side of transformer, i hv seen power factor value of 0.15 only when only 3 KW load was flowing. Further electricity board has suggested to install 4 KVAR capacitor at LV side after energy meter. Now my question is that if we permanantly install and switch on 4 KVAR capacitor after energy meter, during some load on transformer and also without any load on transformer, wht will be the power factor shown in energy meter?i dont want to get any penalty by electricity board, so plz suggest me if i can permanantly install and switch on the 4 kvar capacitor or not at LV side of transformer just after energy meter? Thank you again and awaiting for ur positive reply soon.

9 12924

which is osillator is most used in PCB design? why?

3 6528

Diffrectiate between earthing and neutral

TATA,

6 10061

what is the size of A4 size paper?

Bhel,

7 11300

what is the length of a cigratte?

Marlboro,

4 8585

Why converter duty transformer neutrals are not earthed...i am still not sure if this question is also correct...Please email at ranjan120482@gmail.com

2390

how to calculate the bus bar current rating

2 24730

How to decide CT & PT ratings for a given transmission line carrying some rated voltage?

1 2396

How to decide the rating of CBCT? We have 6.6Kv switchgear & having 50/1 cbct ,i want to know how this 50/1 A came? On what basis we decide CBCT reting?

Cross,

1 8885

What is difference between Step Up Transformer & Booster Transformer? can we used instead of any one?

CS,

2 17768

Difference Between Differential Relay and Restricted Earth Fault Relay of Power Transformers

KSEB,

1 11566

How to calculate sand , cement quantity for 23mm thk brick work(10x10)

1 5271

what"s the cement, sand, aggregate(consumption) quantity for 10 cm thick roof slab (1:2:4)

2901


Un-Answered Questions { Engineering }

A PLC is programmed to drive three motors A, B and C as follows : After running motor A for an hour, motor B should get ON and motor A should get OFF. And after running motor B for an hour, motor C should get ON and motor B should get OFF. And after running motor C for an hour, motor A should get ON and motor C should get OFF. (That is, a cyclic repetition with time period one hour) Now, the second condition is: If any motor gone faulty and is tripped, the consecutive motor should get ON and the faulty (tripped) motor should be eliminated from cyclic repetition. The remaining two motors should bear the cyclic repetition of one hour each. (For healthy motor take logic as high and for tripped motor take logic as low) Now, the third condition is: When motor A load(Amps) exceeds 60% of its rated load, motor B should get ON in parallel to motor A. And when both motors A & B are running in parallel, and if their load exceeds 60% of their rated load, motor C should also start in parallel to A & B. [Here the cyclic repetition is eliminated, until their loads become normal(40%)] [Take logic high(1) for load at 60% and logic low(0) for load at 40%] Now draw a flow chart or a ladder diagram to fulfill the above condition.

2231


Good evening all I need a small favour regarding reliance paper i wanna probable sample papers(e&i) of reliance. if any of u have any idea about dis then plz mail me back.i belongs to electronics and instrumentation engg.so i need e&i papers. thanking u....

2147


which fit is this 177-S6?

2146


i want to know the syllabus for management trainee exam,vizag steel plant,2009

3561


please send me rrb gorakhpur je teli question paper

3776


pls send me model paper of NPCIL for executive trainee. and syllabus of executive trainee 2015.

2845


pls mail some more tecnical qustions at msaranya2610@gmail.com

2158


i am a student of thapar university final year.can anybody please help me with the exam pattern of the companies:engineers india ltd. ; iocl ; UOP, HPCL. If psbl plz send me the previous years questions on this email id k_arora1987@yahoo.com. i d be really greatful

2439


what is the difference between replacement of cement by groundnut shell ash

3291


send interview questins about pro_e to me mohanrvs_1984@yahoo.co.in

2282


please send me bhel questions on rupesh.017@rediffmail.com

2769


consiteunts of indian railways

2393


when will be the iocl interview results i faced interview on 8th september 2008 iam from electrical branch i faced interview for the post of electrical engineer??????????????????????//

2103


Explain the approximate cost of the following corrosion monitoring systems. Smart pebbles eci-1(embedded corrosion instrument) monitoring cables time domain reflectometry &corrosion penetration monitoring system(cpmp)?

1079


two way ckt diagram can be drawn by how many ways? give diagram