Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379) What is standard Sand? What is Regime condition? What do you mean by the core trench in Earthen Dasm? What is soundness test for cement? When negetive shear force takes place in a R.C.C member?
L&T,
1 2724in battery charging room we find two fuses (one in positive other in negative cables ).why it is so?one fuse is ore than sufficient?
1 2336i have one absolute pressure transmitter for the range is -400mmhg to 400mmhg. If i do the zero trim at atmosphere the transmitter should be give 4ma or 12ma? which one is correct?
2 8125800a siemens vcb in our company can not be closed electrcally an mechanicaly cc and oc coils are found ok. why?
2 5872which circuit breaker enclosure is best for maintenance guy? 16 bolt & 20 bolt squre or 16,20 bolt hinge
2 4379
plese send me the oces/dgfs sylabus and previous year question pattern of electrical engg.?
can you please tell me what the current rate of construction material and different construction labourers charge in bangalore ???
please send me previose rrb junior engineer qustion papers
sir,did u send me hpcl syllabus for engg. disiplience & previous year
can any one tell me when ongc placement test and its forms is available????/ pls tell me if u know
Draw the vector diagramme for Asynchronous Induction Generator at noload,half load and fullload.
hi friends kumar here if anybody of u have " INDRAPRASTHA GAS LIMITED" placement papers than plz send it to me i need it urgently..ok mail id is ashish_me2007@yahoo.co.in
Dear Sir, Please send me the questions frequently asked during bhel persoal interview for supervisor trainee With worm regards, Alok Kumar Rout e-mail id- rjdalok22@gmail.com
In PFI plant one stage capacitor connection is directly connected(with out megnetic contact controll). but why?
What will be result if we connect LT votage to the terminal of HT motor?
Why do you want to work here
please send me last year question for executive tranees in ntpc on my email ID rajthakur2091@gmail.com
Why patra you join
can u tel me d question paper of gail?
Please tell me Detail cost of providing& laying nominal mix design 1:2.5:5,40mm nominal size.curing complete e/c cost of form work in foundation and plinth i/c carriage.