Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379) Q1) I am having an interview in a construction company for a large sewage project . Since I have not done any such project , there are some queries from my end. Pls. help me to solve them. I will be thankful to you :- a) Normally for large project 400-600 houses & around 1600 peoples , how much dia pipe is used and which type of pipe is used? b) For trenching , I have heard that IS 1200 implies, what are the rules of calculating earthwork in case of depth of 2m or above ? c) To prevent soil to fall when depth of trench is more , what steps are taken and how there qty. is calculated . Like I have heard about timbering . what is this ? d) What are the rules for disposing off the excavated soil ? e) How the pipes that are used are being jointed? f) In case of cleaning on choks , is there any intermediate things provided? g) For foul gases any outlets are provided thru out length of pipeline? h) What is the flow digram like from houses thru small pipe to main pipeline than where main pipeline disposes wastage ? i) Any other thing that has to be kept in mind while calculating earth work for excavation like steps are made and other things? How earthwork is calculated in case of steps ? Pls. explain with a sketch. Regards,
1 6435why field winding is placed on rotor winding not on stator winding in case of synchronous machine?
13 38382How to increase home power factor? Can we connect capacitor directly? How to select capacity of capacitor?
5 9557hi i have selected for nda and could please send me the courses offered in nda regarding engineering and all other courses????
1830What is percent age of scrap of wires as per IE Rule Clause No in wiring for House and Industrial wiring ?
3 4969
The main disadvantage of sliding mesh type of gear box is a) High noise level b) Low mechanical efficiency c) High skill required by the driver d) all of the above
How to work meggar?
Is the unit and normal value fuel ratio of an average diesel engine?
Transformer how to maintaince a check b check c check d check
Which instrument has all the features of try-square, bevel protractor, rule and scriber?
What is reactive power and where it is used.
How α and β are related to each other?
How capacitor bank can prove superior to synchronous condensers w.r.t. power factor correction??
during installation time of transformer and alternator which points we have to observed?
the 3 most common transmitter protocol being in refinery or qatar gas and aramco.
can anybody send me the technical papers of hewitt associates pls...I cleared aps n GD n has only less time for technical round?
What is a demultiplexer?
What are the reasons for the parallel operation of transformers?
how to do the ductor test?
HAI SENT HPCL APTITUDE QUESTION PAPER, MY EMAIL ID IS angus_eee04@rediffmail.com,angus_eee04@yahoo.com