Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379) Q1) I am having an interview in a construction company for a large sewage project . Since I have not done any such project , there are some queries from my end. Pls. help me to solve them. I will be thankful to you :- a) Normally for large project 400-600 houses & around 1600 peoples , how much dia pipe is used and which type of pipe is used? b) For trenching , I have heard that IS 1200 implies, what are the rules of calculating earthwork in case of depth of 2m or above ? c) To prevent soil to fall when depth of trench is more , what steps are taken and how there qty. is calculated . Like I have heard about timbering . what is this ? d) What are the rules for disposing off the excavated soil ? e) How the pipes that are used are being jointed? f) In case of cleaning on choks , is there any intermediate things provided? g) For foul gases any outlets are provided thru out length of pipeline? h) What is the flow digram like from houses thru small pipe to main pipeline than where main pipeline disposes wastage ? i) Any other thing that has to be kept in mind while calculating earth work for excavation like steps are made and other things? How earthwork is calculated in case of steps ? Pls. explain with a sketch. Regards,
1 6481why field winding is placed on rotor winding not on stator winding in case of synchronous machine?
13 38693How to increase home power factor? Can we connect capacitor directly? How to select capacity of capacitor?
5 9705hi i have selected for nda and could please send me the courses offered in nda regarding engineering and all other courses????
1848What is percent age of scrap of wires as per IE Rule Clause No in wiring for House and Industrial wiring ?
3 5048
According to IEC60034-14, When the vibration monitoring system required for motor Bearing. above which KW, it is required? and for what type of bearing the vibration probe is provided.
What's mean HVF & HAF in Vacuum Circuit Breaker?
how many material required for brickbat water proofing of toilets.
Describe Hooke's Coupling and its uses.
"Gates of the dams are generally designed of curved shape". Why?
Instead of specifying SETUP and HOLD time, can we just specify a SETUP time for '1' and a SETUP time for '0'?
rajha power sector details
What are potential transformers?
please sent last five years junior engineer mechnical question pappers
What is the fault or needs to be done when frequency in ac drives is not changing?
What is the working mechanism of OLTC in Power Transformers????
We have given to 3phase supply to ups system & how can coming netural
what"s the sort of beams?
In General please do read newspapers.And be thorough with 10th history and Geography.Biology also
Is it required to use Automatic transfer Switch in L&T panel board if we use AMF panel with DG set? How the single line diagram will be? Please forward the material to sreenu_207@yahoo.co.in