Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379) how can we make cable shedule for controll wiring ? which details must be required for it.?
L&T,
2100what difference between tapping -15% to +5 % and -5% to +15% tap. & how can define HV turns on maximun & minimum tap of power transformer.
2 4883list three things you can do with the files you create by recording your voice on your computer?
2 14905In case of Transmitter's(e.g.Ultrasonic Flow meter ) we have an normal practise of selction of upstream and downstream distance such as (20D and 5D ).can anyone please let me know whow to calculate "D" ?? i guess it refers to pipe thickness is t right ?
2 4665what is the difference between "Rotary bypass isolation switch and Normal bypass switch" pls share indepth techs?
2007
please answer the following question: A table contains the monthly sales data for the 12 months of a year and for the 4 sales zones where each zone has 8 districts.The table is defined in WORKING-STORAGE SECTION.What is the size of the defined table in number of bytes? write statements to calculate the total sales for each month.
What are the advantages and disadvantages of open loop control system?
Why silicon and germanium are the two widely used semiconductor materials?
What is the difference between proof resilience and modulus of resilience ?
What is the Boundary value analysis and Equlance class partition for select * from emp
Caching, Multithreading and RAMBUS are 3 methods for resolving the Bottleneck problem. Please give an explanation for each one (how are they resolve the problem?)
Define what is meant by small signal amplifier?
In which process internal energy remains constant ?
For a stable system, where should the poles of a system be in a root loci plot?
what is the need of constractor explain with sutable progarmming example
What do you do when in your duty, ME alarm oil mist detect high density?
How to calculate the area of a irregular sized land in square feet?and what will be the total area of this land South-51.1ft , North-47.7ft , East-53.3ft , West-54ft ?please explain me how to calculate?
Block diagram of Power line communication?
What type of pipe material G.I or M.S is used for sprinkler system?
I have an existing old MCCB. ABB Model SACE, the rating are: Ue = 660 volts, Iu =1250 Amps, 3 poles, Ith (max) =800 amps at 45 deg C. I need a circuit breaker for my 3 phase motors, 380 volts 60 hz. the supplier required the minimum ampacity of the breaker to be 911 amps. can i use this breaker with rating of Iu =1250 amps but Ith = 800amps maximum?