Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379) what is periode of deshuttering of slab our span length 21m,and width 2.5m grade of concrete M-35
3 7881I am a post dip. in machine maintenance , 2004 passed out and i am persuing my graduateship in industrial engg. and i would like to know, whether i am applicable to do any certification cource . And i would like to know, whether i am eligiable to do ann master degree since i have working experience of more than 8 Years in Larsen & Toubro,
1800
What is mechanism?
Explain in wave guides tem wave propagation is not exit, give the physical interpretation?
Heat a vessel with water inside and cool it under tap suddenly. Now when we try to open it...It does not open easily ...why?
An ELHNC 80amp 240v 30mA RCD is tripping periodically, every 30 - 180 seconds is it safe to disconnect the protection circuit?
we are going to install a solar PV site and how can we calculate PV Solar Panel Efficiency, can anybody tell me complete method for its calculation.
EXPLIAN THE IMPORTANCE OF POLY PHASE CIRCUIT.
what is cyclon vibration effect in turbine
Why control of DC motor is simpler?
Explain the application of using flyback converter.
What are the different types of wings? Explain how any one particulartype of wing suits a particular mission?
why e1 capacity 2048 define details?
how can i find cable size from current rating?
what is metering cum synchronizing panel and how it is used?
234 MVA Generator 3 phase Short circuit current Values required? Gen set Rating-234 MVA, Gen Voltage-18kv, PF;0.8, Xdv:23.5 %, Transformer Rating-18/380KV, 680MVA,Yndd1 two winding, Step up TR, ZT:35.50 %,X/R 4.33 Gen CB Position, CB open ,Disconnected open, Generator Running Voltage 18 Kv, Bi mistakes generator side earth switch Closed during that time short circuit current level in 3 Phase required, and how to test on site 234MVA Generator Short circuit current,
Define settling time.