What is the least count of Theodalite survey?
Answers were Sorted based on User's Feedback
Answer / akshaya
The least count of Theodalite survey is about
10 second to 20 second.
Least count is the difference of the samllest value of main
scale to vernier scale.
Is This Answer Correct ? | 6 Yes | 2 No |
20 mpa what is the quantity of cement sand and aggregate in one cubic meter of pcc non rainforcement concreate kindly answer including formaula thanks
How to calculate canal slope curvature qty!
how to calculate the circular beam reinforcement.its a helipad beam. Dia of bar 25 mm. if its consider any elongation?
water leak detection system question & answer
what is the actual productivity of carpentor,fitter,masson for brickwork and masson for plaster etc
how many bag of cement needed for concreting 14.93 m3 at the ratio of 1:4:6 and 1:5:6
In barbending schedule why is o.42*D is taken. Means why o.42 only???
How calculate the physical stock of material such as Fine/Coarse aggregate,sand & stone dust laying at site?
In case of tunnels (Railway) what is the way of securing a wall beam?
How reactor of SBR installed , is it be over ground, fully under ground or semi sunk ?
what is the difference between GSB & WBM ?
what is the advantage of electronic theodolite over transit theodolite?