What is the least count of Theodalite survey?

Answers were Sorted based on User's Feedback



What is the least count of Theodalite survey?..

Answer / himanku

20 second

Is This Answer Correct ?    48 Yes 2 No

What is the least count of Theodalite survey?..

Answer / nanthakumar.c

0Degree 0min 20second

Is This Answer Correct ?    15 Yes 1 No

What is the least count of Theodalite survey?..

Answer / magi

20 sec

Is This Answer Correct ?    12 Yes 2 No

What is the least count of Theodalite survey?..

Answer / akshaya

The least count of Theodalite survey is about
10 second to 20 second.
Least count is the difference of the samllest value of main
scale to vernier scale.

Is This Answer Correct ?    6 Yes 2 No

What is the least count of Theodalite survey?..

Answer / shalu verma

Least count of Theodolite - 20"

Is This Answer Correct ?    3 Yes 0 No

What is the least count of Theodalite survey?..

Answer / sivakumar

0Degree 0min 5second

Is This Answer Correct ?    17 Yes 18 No

Post New Answer

More Civil Engineering Interview Questions

20 mpa what is the quantity of cement sand and aggregate in one cubic meter of pcc non rainforcement concreate kindly answer including formaula thanks

0 Answers  


How to calculate canal slope curvature qty!

0 Answers  


how to calculate the circular beam reinforcement.its a helipad beam. Dia of bar 25 mm. if its consider any elongation?

1 Answers   Gammon,


water leak detection system question & answer

0 Answers  


what is the actual productivity of carpentor,fitter,masson for brickwork and masson for plaster etc

4 Answers  






how many bag of cement needed for concreting 14.93 m3 at the ratio of 1:4:6 and 1:5:6

1 Answers  


In barbending schedule why is o.42*D is taken. Means why o.42 only???

1 Answers  


How calculate the physical stock of material such as Fine/Coarse aggregate,sand & stone dust laying at site?

3 Answers  


In case of tunnels (Railway) what is the way of securing a wall beam?

1 Answers   L&T,


How reactor of SBR installed , is it be over ground, fully under ground or semi sunk ?

0 Answers   GMR,


what is the difference between GSB & WBM ?

1 Answers   CBC,


what is the advantage of electronic theodolite over transit theodolite?

3 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)