What is the least count of Theodalite survey?

Answer Posted / akshaya

The least count of Theodalite survey is about
10 second to 20 second.
Least count is the difference of the samllest value of main
scale to vernier scale.

Is This Answer Correct ?    6 Yes 2 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

How to use of me trial wall plaster 6mm , 10mm par sqm. use in sand and cement ?

1709


What are the alternate material for steel, Sand and aggregate

1834


can i get hindi version of is codes based on civil engineering?

3886


Please let me know about answer for my Question as "What is the maximum wastage allowable of HYSD Steel in any Bridge project as per Code and Code reference also ?

1442


Describe the various methods of concrete curing?

686






What do you mean by tolerance factor of concrete ?

2673


which steel is better for residential building tmt steel or hysd steel

1773


what are the Task work of different labour.?

2164


Which ratio use for cement selery???

1392


step by step procedure to find out the percentage of steel in coloum,beam,slab,footing in detailed

1918


Providing and casting in situ cement concrete M-25 of trap/granite/quartzite/gneiss metal for rcc, Providing formwork,Curing the concrete and Complete. what is rate per Cum. and what is rate for M-30 Grade Concrete.

2775


how to remove the quantity of metal 1 and metal 2 in concrete

1536


How to find CN by using arcgis 9.3?

1887


How much material will consume for following specification water tank (9*7.5*6 feet)?

1629


What is the Systematic Responsibility Site Engineer? Who are the above and under co-oridinating ? What is office & Site co-ordination of Site Engineer?

1674