Answer Posted / shalu verma
Least count of Theodolite - 20"
Is This Answer Correct ? | 3 Yes | 0 No |
Post New Answer View All Answers
Define aligned dimension?
what is detail procedure of eccentric footing? plz. give solved exmple?
What is the difference between undo & redo?
What expenses counted in contingencies and how much it is in related to built-up area of the building.
a) we have 30nos., 300mm dia, 4m length double under reamed piles.calculate excavation quantity.b) tell concrete qty. also.
How to decide/consider the grade of bitumen for dbm.
What should be the standard roof height like to be?
Design a cantilever slab to carry a live load of 2000 N/m2. The overhang of the slab is 1.20m. b) A slab over a room is 4.75m x 4.75m. The edges of the slab are simply supported and the corners are not held down. The live load an the slab is 300 Kg/m2. The slab has a bearing of 15cm. On the supporting walls. Design the slab as per Rankine - Grashoff theory. Assume weight of R.C.C. = 2400 Kg/m2.
is there any influence of water(used for mixing of concrete) on a weight of harndend concrete.
What is meant by cad?
What are the advantages and disadvantages of using plastic and timber fenders?
How to compute minimum number of columns required for a site from area of site?
cause of cylinder test failure
What is labor and material payment bond?
How many times we can use Fresh bentonite ford wall execution? Would like to know the clear concept of recycling. After flushing can we use it for another time time for flushing? Or we have to use it for for excavation only?