Answer Posted / himanku
20 second
| Is This Answer Correct ? | 48 Yes | 2 No |
Post New Answer View All Answers
150mm bricks size how many use 4.14 m3
how to remove the quantity of metal 1 and metal 2 in concrete
Kindly post me previous year interview questions with answer for post of DY. Manager (civil engg.) for GAIL, NTPC, IOC, OIL and ONGC etc.
cement, sand, aggregate,reinforcement & concrete consumption per square feet in multi storeyed building
If we don't have drawing for Excavation of building,At what rule we will go for excavation and how much depth will go for a villa?
can stub column take the load as main column
How much area, in square meters, will one liter of paint cover if it is brushed out to uniform thickness of 100 microns?
in plate load test what is the thickness of plate 20mm 5mm 50mm none
plz.show development and anchorage length in simple diagram.
1)Why we can use half brick in 4inch wall and 2)why not in 9+inch brick wall
factory shed foundation l=4, b=3' d=8' rcc foudation for top to bottom pl tell me cement ,steel ,sand ,labour cost ,excavtion,soil is weak not so hard
What are the responsibilities of a construction manager?
What is absolute pressure? How absolute pressure is calculated?
Please tell me the quantity of cement, sand, flyash, foaming agent required for 1 cubic meter of cellular lightweight concrete blocks. also , is there any admixtures required for the CLC blocks production.
Give me an example of a time when something you tried to accomplish and failed.