Answer Posted / magi
20 sec
| Is This Answer Correct ? | 12 Yes | 2 No |
Post New Answer View All Answers
which formula used for calculate the area of segmental arch?
What is oneside mat. And explain
How Can I know the wastages(%) of each work added in estimating the quantity of construction materials?(Eg. Ceiling Work, Brick Work,etc....)
how can can column be corrected when the design is not safe ? is the increasing the clearcover a solution?
5. Do you feel that your present employer estimates your full work potential? Are they pleased with your work performance?
five requirements of infill panels for walls?
Where can I get a Text Book on Design of Blast Resistant Buildings in PDF form.
how to caliculate required amount of cement and sand required for 1cu.m.
How to measure the requirement of cement n sand for 12mm and 20mm plastering thanks in advance
How do you convert wind speed into force?
Explain the different types of building contracts?
Explain how you can turn off the display for dimension in CAD?
what is diffrence between catchment area,watershed and basin?
How to calculate brick work quantity?? Block work quantity??
a) we have 30nos., 300mm dia, 4m length double under reamed piles.calculate excavation quantity.b) tell concrete qty. also.