wha is frog?..

Answer / t.vinod kumar sriharikota

frog is placed at top of the brick which shows the manufacturer name and it acts as key between the layers.

Is This Answer Correct ?    4 Yes 0 No

wha is frog?..

Answer / pravin

part of brick...at top side

Is This Answer Correct ?    0 Yes 0 No

wha is frog?..

Answer / ram

A depression the Face of the Brick

Is This Answer Correct ?    0 Yes 0 No

wha is frog?..

Answer / er. umesh sharma

frog is a depression on the top of the brick which acts as a key in between two courses of the masonry.It also show the manufacturer name.

Is This Answer Correct ?    0 Yes 0 No

wha is frog?..

Answer / vivek

it is the top prtion of the brick....

Is This Answer Correct ?    4 Yes 5 No

wha is frog?..

Answer / amar kantak

A TYPE OF MECHANICAL DEVICE OR JOINT.

Is This Answer Correct ?    1 Yes 3 No

Post New Answer

More Civil Engineering Interview Questions

If we have the center line of the Finnish road level and we want to know what level of pay would have offset the Lhs and Rhus RHS 1,2.5,5 1,2.5,5 m.

0 Answers  


Define What is Civil Engineering?

0 Answers  


1sqm tile laying how much cement required?

2 Answers  


how to calculate quantity of cement and sand for plastering works in CM 1:6 proportion.....plz answer anyone.....and write the formula...

4 Answers  


what is lap length?

6 Answers   Simplex,






how to caliculate required amount of cement and sand required for 1cu.m.

0 Answers   Allied Group, L&T,


afe or not

0 Answers  


What is Time period of a building and its relation with frequency ?

0 Answers  


Design a cantilever slab to carry a live load of 2000 N/m2. The overhang of the slab is 1.20m. b) A slab over a room is 4.75m x 4.75m. The edges of the slab are simply supported and the corners are not held down. The live load an the slab is 300 Kg/m2. The slab has a bearing of 15cm. On the supporting walls. Design the slab as per Rankine - Grashoff theory. Assume weight of R.C.C. = 2400 Kg/m2.

0 Answers  


How to calculate concret slab? W l t(4mts*5*2fts) ratio m25 grade pls tell me procedure

0 Answers   Ravi Group,


Explain what is the difference between built area and super built up area?

0 Answers  


how to calibrate the RM 800

0 Answers   BNR,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)