Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


1 Cum Brick Work CM 1: 6 - How Many Bricks ,sand,Cement
Required? Brick Size 9" 4.5" 3"

Answers were Sorted based on User's Feedback



1 Cum Brick Work CM 1: 6 - How Many Bricks ,sand,Cement Required? Brick Size 9" 4.5" 3&q..

Answer / er.harjinder singh

Exp:-length of wall=10ft
Bredth of wall=4.5in
Height of wall=9.5ft
Qty.10*0.375*9.5=35.625cft
Provide .5in morter in each line of bricks.
So,first calculate qty.of mortar in total work with following steps:-
Step-1. Calcuate qty. of mortar in one line
of bricks:-
10*0.375*0.0625=0.2344cft.
Step-2. Calculate nos. of lines of bricks in given height:-
9.5/0.292=32.53 or 33bricks.
Step-3. Calculate qty. of mortar:-
33*0.2344=7.73cft.
So,Total brick work:-
35.625-7.73=27.895cft
Net. Qty. of bricks=
27.895/0.0703=396.8bricks
say 397 bricks

Is This Answer Correct ?    31 Yes 28 No

1 Cum Brick Work CM 1: 6 - How Many Bricks ,sand,Cement Required? Brick Size 9" 4.5" 3&q..

Answer / sidhaant gupta

cement = 1*0.3/7*1440 = 61.71 kg or 1.234 Bags
sand = 9.08 Cft
Bricks = 451 Nos

Is This Answer Correct ?    2 Yes 0 No

1 Cum Brick Work CM 1: 6 - How Many Bricks ,sand,Cement Required? Brick Size 9" 4.5" 3&q..

Answer / md gyasuddin ahsan

Sorry For above Answer

By Analysis of Rate-2007

#Bricks of class designation 7.5 in foundation and plinth
in :-
Brick with wastage = 494
Mortar = .25
Cement Ratio is 1:6, then
Cement=(.25/(1+6))*1 = .0357 cum
Cement in Bags = .0357/.034722 = 1.0286 bags

Sand = (.25/(1+6))*6 = 0.2143 cum
= 0.2143 * 35.29 = 7.56 Cft
# Bricks of class designation 7.5 in superstructure above
plinth level up to floor V level in all shapes and sizes
in:-
Brick with wastage = 494
Mortar = .22
Cement Ratio is 1:6, then
Cement=(.22/(1+6))*1 = .03143 cum
Cement in Bags = .03143/.034722 = 0.905 bags

Sand = (.22/(1+6))*6 = 0.189cum
= 0.189* 35.29 = 6.655 Cft

Is This Answer Correct ?    20 Yes 19 No

1 Cum Brick Work CM 1: 6 - How Many Bricks ,sand,Cement Required? Brick Size 9" 4.5" 3&q..

Answer / shahvez

By Analysis of Rate-2007

#Bricks of class designation 7.5 in foundation and plinth
in :-
Brick with wastage = 494
Mortar = .25
Cement Ratio is 1:6, then
Cement=(.25/(1+6))*1 = .0357 cum
Cement in Bags = .0357/.034722 = 1.0286 bags

Sand = (.25/(1+6))*6 = 0.2143 cum
= 0.2143 * 35.29 = 7.56 Cft
# Bricks of class designation 7.5 in superstructure above
plinth level up to floor V level in all shapes and sizes
in:-
Brick with wastage = 494
Mortar = .22
Cement Ratio is 1:6, then
Cement=(.22/(1+6))*1 = .03143 cum
Cement in Bags = .03143/.034722 = 0.905 bags

Sand = (.22/(1+6))*6 = 0.189cum
= 0.189* 35.29 = 6.655 Cft

Is This Answer Correct ?    14 Yes 13 No

1 Cum Brick Work CM 1: 6 - How Many Bricks ,sand,Cement Required? Brick Size 9" 4.5" 3&q..

Answer / salman

depends upon brick size

Is This Answer Correct ?    1 Yes 0 No

1 Cum Brick Work CM 1: 6 - How Many Bricks ,sand,Cement Required? Brick Size 9" 4.5" 3&q..

Answer / prithvi

For 1cubic meter:
No.of bricks with motar is 392 but say 400,
Cement is 1.5 bag,
Sand is 0.23 to 0.275 depends on motar ratio,generally we consider 0.26cu.m of sand

Any doubts please contact on watspp to 9010557759

Is This Answer Correct ?    1 Yes 0 No

1 Cum Brick Work CM 1: 6 - How Many Bricks ,sand,Cement Required? Brick Size 9" 4.5" 3&q..

Answer / aamu

Generaly we cosidered as a wall of thickness of 9"
Then when we calculate no. of brick per sq.ft. then we should consider above thick.
let cal. no.of brick/sqft = (12"x12"x9")/(8.5"x5.5"x3")
=9.240
Then if we add thck of mortar 1/2"(12cm) no.of bricks= 9.010
Total no of bricks in one brass
= 10x10x9
=900
and also add 5%wastage.

Is This Answer Correct ?    2 Yes 1 No

1 Cum Brick Work CM 1: 6 - How Many Bricks ,sand,Cement Required? Brick Size 9" 4.5" 3&q..

Answer / asmita balkhande

19*9*9=550
20*10*10=500

Is This Answer Correct ?    1 Yes 0 No

1 Cum Brick Work CM 1: 6 - How Many Bricks ,sand,Cement Required? Brick Size 9" 4.5" 3&q..

Answer / arunava singha

brick size in meter=.23*.115*.075 =.0019
add 10 mm mortar for ech sides=(.24*.125*.085)=(.0025)

bricks required for 1 m3 =(1/(0.0025)=400 nos

mortar required =(.0025-.0019)*400=.24

add 15% for wastage = (.24*1.15)=.276m3

so required sand is =.276 m3

cement is =(1440/6)=240*.276= 66 kg

Is This Answer Correct ?    1 Yes 0 No

1 Cum Brick Work CM 1: 6 - How Many Bricks ,sand,Cement Required? Brick Size 9" 4.5" 3&q..

Answer / sulaiman

volume of 1 brick = 0.2286*0.1143*0.0762= 0.00199103 cum
consider 1" thick mortar on either sides

volume of 1 brick with mortar = 0.2413*0.127*0.0889= 0.00272435 cum
No of brick work for 1 cum with mortar = 1/0.00272435 = 367 bricks
No of bricks without mortar for 1 cum= 1/0.00199103 =503 bricks

volume of mortar = (0.00272435-0.00199103)*367= 0.269 cum

volume of mortar in dry condition= 0.269*1.33= 0.358 cum

Cement required= 0.358*1/7*1440= 73.64 kg= 1.473 bags

sand required= 0.358*6/7*35.3357= 10.84 cuft

Is This Answer Correct ?    1 Yes 1 No

Post New Answer

More Civil Engineering Interview Questions

Reinforcement details at hinged joint

0 Answers  


Can we use concrete of slump cone in cube casting in which we have already measured slump?

0 Answers  


How to calculate soil bearing capacity of soil?

1 Answers  


How much area, in square meters, will one liter of paint cover if it is brushed out to uniform thickness of 100 microns?

0 Answers  


Can anybody help by describing each and every step in short, used while giving a building layout by total station? Regards

0 Answers  


How to check Diameter of Np2 rcc pipe?

1 Answers  


How to marking the building

0 Answers  


How foundation is designed, Column design and beam design

3 Answers   Essar, L&T,


For the construction project what capital cost has to be taken in consideration?

0 Answers  


DESIGN PROCEDURES OF R.C.C ELEMENTS

3 Answers   TCE,


how much volume is one bag cement of 50kg

15 Answers   Portland, RJB, UltraTech,


how u design STAGING for Superstructure in BRIDGE construction?

0 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)