Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

1 Cum Brick Work CM 1: 6 - How Many Bricks ,sand,Cement
Required? Brick Size 9" 4.5" 3"

Answer Posted / md gyasuddin ahsan

Sorry For above Answer

By Analysis of Rate-2007

#Bricks of class designation 7.5 in foundation and plinth
in :-
Brick with wastage = 494
Mortar = .25
Cement Ratio is 1:6, then
Cement=(.25/(1+6))*1 = .0357 cum
Cement in Bags = .0357/.034722 = 1.0286 bags

Sand = (.25/(1+6))*6 = 0.2143 cum
= 0.2143 * 35.29 = 7.56 Cft
# Bricks of class designation 7.5 in superstructure above
plinth level up to floor V level in all shapes and sizes
in:-
Brick with wastage = 494
Mortar = .22
Cement Ratio is 1:6, then
Cement=(.22/(1+6))*1 = .03143 cum
Cement in Bags = .03143/.034722 = 0.905 bags

Sand = (.22/(1+6))*6 = 0.189cum
= 0.189* 35.29 = 6.655 Cft

Is This Answer Correct ?    20 Yes 19 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

what is thumb rule for calculating the size of ISMB required for a particular length of span

3463


what does the track parameter mean in staad.pro?

6097


what is the list of building construction equipment & teir output?

2106


Why the statue of liberty is made of copper?

1107


on what basis the partial factor of safety are decided? form the load combinations

2264


How much percentage of brick bats allowed in CD-75 bricks

2321


Define What is the meaning of a blue land surveyors flag?

1230


What is OSHA compliance?

1151


What is the veriplus for ellips card length formula (major axis 3.4m,minar axis 2.6m spacing 0.2m

2196


Exterior Joints,define

1940


primary treatment of sewagw consist of removal of floating materials removal of sand & grit removal of organic materials all above

2246


which has high compressive strength between hollow block and brick masonry?

2389


I want to know how much the lapping length for the pilecap reinforcement.. we r using single pile cap which is 24mby54m and 2.5m depth.. total 91piles are supporting the pile cap.. how to do a steel reinforcement??

2361


Thumb rule for steel qty for 1m2 in kg/m2 column slab footing beam

5624


What is Rankine Cycle?

1107