1 Cum Brick Work CM 1: 6 - How Many Bricks ,sand,Cement
Required? Brick Size 9" 4.5" 3"
Answer Posted / er.harjinder singh
Exp:-length of wall=10ft
Bredth of wall=4.5in
Height of wall=9.5ft
Qty.10*0.375*9.5=35.625cft
Provide .5in morter in each line of bricks.
So,first calculate qty.of mortar in total work with following steps:-
Step-1. Calcuate qty. of mortar in one line
of bricks:-
10*0.375*0.0625=0.2344cft.
Step-2. Calculate nos. of lines of bricks in given height:-
9.5/0.292=32.53 or 33bricks.
Step-3. Calculate qty. of mortar:-
33*0.2344=7.73cft.
So,Total brick work:-
35.625-7.73=27.895cft
Net. Qty. of bricks=
27.895/0.0703=396.8bricks
say 397 bricks
Is This Answer Correct ? | 31 Yes | 28 No |
Post New Answer View All Answers
What is the procedure and technnology behind jointing of prestessed block in Delhi metro rail project.
In reclamation works what are the importance of geotextiles and sand?
what is the water cement ratio for plastering
What is the Hardness of M-40 grade concrete, general and theoratical
all technical question
how to identify the failure of building by expansive soils
How can we calculate 8- storied Madrasha Building pile capacity by taking SPT value at site?
cement, sand, aggregate,reinforcement & concrete consumption per square feet in multi storeyed building
how to find the cement bags and sand requirements for the one square meter of internal,external,ceiling plastering by using the various ratios like 1:3,1:4,1:5,1:6
Explain creep?
what is the weight of 6000 psi concrete in lb/cft?
When column of building is abutting the boundary line,then suitable footing advised is
weight of 1 cft 10mm, 20mm, 40mm aggregate weight of 1cft course sand
why steel tanks are provided (a) for water pressure (b) for wind pressure (c) for earthquake pressure
Can someone please be curing period of the following according to IS codes Column beam slab brick masonry raft found. and also tell how many hours/day