What is the difference between shuttering
Answers were Sorted based on User's Feedback
Answer / biplab ghosh
shuttering means a shape made before pouring of concrete as
specific size and diamention. This shape is made by
plywood/plate and with proper support.
centring means supporting arrengment of roof slab from
bottom.
Is This Answer Correct ? | 137 Yes | 23 No |
Answer / devi singh
Shuttering is the frame or base provided for RCC structure
while centering is the support for shuttering.
Is This Answer Correct ? | 33 Yes | 18 No |
Answer / joy
shuttering means form work for concreting , and centering means proper positioning of reinforcement with shuttering.
Is This Answer Correct ? | 24 Yes | 15 No |
Answer / sheik.s
Shuttering is the structure prepared by mostly wood or steel
for pouring of concrete. centring is vertical spports for
withstand that..
Is This Answer Correct ? | 13 Yes | 4 No |
Answer / mohammad eqbal
The vertical form work is called shuttering,where as horizontal form work is called as centring.
Is This Answer Correct ? | 40 Yes | 36 No |
Answer / rakesh pattnaik
In answer #6 I don't get the proper solution. As can i say it shuttering if someone is asking me for centring if there are no difference between these words ? My experience says centring is alignment of TMT iron bars to hold and grip the concrete , while shuttering is to keep it(concrete) in proper place as per our required design
Is This Answer Correct ? | 5 Yes | 3 No |
Answer / shamshair ali
the temporary support provided to the form work for supporting component parts of an arch, dome or other roofing structure is called centering
the temporary support beneath and at the sides of precast or cast in-situ concrete work is called shuttering.
Is This Answer Correct ? | 6 Yes | 4 No |
Answer / nitin lahane
Centering is define as a proper arrangement of the Shuttering for giving dimension to structure.
Is This Answer Correct ? | 6 Yes | 5 No |
Answer / ashwini
In vertical member such as columns etc which are supported by the shuttering and the base of the beam etc are supported by centering.
The shuttering can be removed by two or three days but the centering can be removed by only as per the days of beam.
Is This Answer Correct ? | 1 Yes | 0 No |
Answer / mukarram
I Think there is no Difference between the two.. both are
the same..
Formwork is the term given to either temporary or permanent
moulds into which concrete or similar materials are poured.
In the context of concrete construction, the falsework
supports the shuttering moulds.
and same for shuttering also...
Is This Answer Correct ? | 12 Yes | 12 No |
what is step foundation
what is the difference between prime coat and tack coat in road construction
150mm bricks size how many use 4.14 m3
Hi is it any equation or relationship that describe the stress-strain diagram in concrete deep beam?
what is called fck
230mm thick brick wall 10rmt length and 4.1 mtr high brick wall. tell quantity of cement,sand,brick required? Also tell me labour required to complete brickwall in 2days
how to convert cement, sand aggregate quantity from M3 to kg with full description?
Write short note on construction programme for pile foundation.
how amny bricks of size 240 mm X 120 mm X70 mm are required in 100 cubic meter brickwork. How much cement is required at 10 mm masonry and at 4:1 sand cement ratio and how much cubic meter of sand is required for the above work.
Define What is a kip?
Pl answer. when we deduct 2d for cutting length of 90deg bend, whats the method of booking measurements as per IS code? whether cutting Length to be booked or something else?
purpose of hook and bend in reinforcement ?