Answer Posted / ashwini
In vertical member such as columns etc which are supported by the shuttering and the base of the beam etc are supported by centering.
The shuttering can be removed by two or three days but the centering can be removed by only as per the days of beam.
Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
What is the FE 250 structural steel of 8mm tk plate testing sample intervals with IS code or international code?
4. Differentiate between NC and OC soils. Draw curves for (i) Stress vs Strain (ii) Volume charge vs Strain (iii) Pore pressure vs Strain for these soils
Moisture content calculation for diff mix ratio's ??
What is the worlds largest concrete dam?
What is the wall thickness of NP-3&NP-4 hume pipe as per I.S code
rate analysis for cement pointing 1:4 , for 100 sq m
PL.tell me about civil engineering questions with answer
for 200 kg of cement how is the mix proportion in kg for m25 grade of concrete
Explain how you can use different dimension tools in CAD? What are the different dimensions available?
what is education Cess.
Explain what is 1/8 on the architect ruler denotes?
what will be density of a cement bag if its weight and volume are 50kg and 1.25 cft respectively???????
questions with answers to face an interview of an civil engineer regarding RCC buidings
Who name us Engineer & Why?
How is the strength of cement measured?