Answer Posted / mukarram
I Think there is no Difference between the two.. both are
the same..
Formwork is the term given to either temporary or permanent
moulds into which concrete or similar materials are poured.
In the context of concrete construction, the falsework
supports the shuttering moulds.
and same for shuttering also...
Is This Answer Correct ? | 12 Yes | 12 No |
Post New Answer View All Answers
how calucate cement sand ratio for plstering
How many types bend used in civil reinforcing
how can we construct building without foundation providing only grade beam at ground level
very simple or less time consuming formula for reinforcement calculation by moment
pls give me ans to ACT formula cube testing porpuse
what is high type road and low type roads
What is the standard unit weight of Cast Iron pipe of 200MM Dia.(pipe specification is IS1538)
how i can tak Quantity of mortar in block work
why steel tanks are provided (a) for water pressure (b) for wind pressure (c) for earthquake pressure
How to determine thee cut length for steel reinforcement bars in R.C.C design
in staad ,why we realease a moment of a member ? what is affect if we realease a moment
what is right & short method of measurement of slab&beam
how do we design mix ratio?
strength of bitumen concrete with 80-100 & 60-70 grade bitumen
What is the Unit weight of coarse sand (F.M- 2.20) ?????