What is the difference between shuttering
Answers were Sorted based on User's Feedback
Answer / devangie
shuttering of course is the framework done before concreting but centering is done while shuttering for proper placement.
to construct an arch ...we need to do shuttering perhaps centering.
| Is This Answer Correct ? | 2 Yes | 3 No |
Answer / satish ramnath pekhale
Shuttering is formwork which is used to shape up footing, column, beam , slab as per there given shape and sizes. While centering is process of marking center over actual site as per drawing
| Is This Answer Correct ? | 6 Yes | 7 No |
Answer / shenbagaraj.t
all vertical surfaces is shuttering and all horizontal
surfaces is centering.
| Is This Answer Correct ? | 2 Yes | 3 No |
Answer / arjun ariyan
Shuttering is the base support for the structure. Centering is Support for the base support :)
| Is This Answer Correct ? | 2 Yes | 3 No |
Answer / rajesh d karde
vertical member supporting is call shuttering and horizontal
member supporting call centering
| Is This Answer Correct ? | 1 Yes | 2 No |
Shuttering is a engineers technical term and centring is a
colloqueal name given by the shuttering carpenters. (like
prakruthi and vikruthi)
| Is This Answer Correct ? | 12 Yes | 19 No |
Answer / chandu
There is no difference between centring and shuttering its
called shuttering for centring work.shuttering means
meterial and centring is a name of work.
| Is This Answer Correct ? | 6 Yes | 36 No |
Answer / praveen kumar
shuttering is very useful as it reduces the plastering
works. The steel shuttering when used with proper oiling is
much easier to remove and also offers excellent finishing.
A temporary, usually wooden or steel framework on which an
arch, slab,vault, or dome is supported during construction.
| Is This Answer Correct ? | 6 Yes | 36 No |
Answer / shaik abdul
Shuttering means form work & centring means reinforcement
work
| Is This Answer Correct ? | 28 Yes | 71 No |
Answer / sathy
If we do below basement, it is called shuttering. if we do
above basement it is called centering
| Is This Answer Correct ? | 16 Yes | 75 No |
what is zero slump concrete
what is C50 expressed in kg/m3
What is vertical dpc and where it is construct?
1 Answers Kanwarji Construction,
Contrete reaches its full strength in 28 days. Then, why are we removing shutter in 7/ 14 days?
What is the standard brick size in India(IS)
what is w/c ratio in dry lean concrete for m10 mix design
Dear Friends am S.PRABHU looking for job chnage i have wonderfull exposure to both Construction works & i have a experience 11 years if any found any suitable opening, please Contact 9986539249
Determine the production capacity of a treatment plant for a city of 1,250,000 population. Assume the specific consumption per capita of 15ol/c/d, non-domestic water use of 30,000,000 m³/year, and UFW of 12%.
what is difference in chemical composition between fe415 and fe500
The name priyesha Deshmukh is associated with A) literature B) shooting C) wrestling D) golf
how much concrete solid/hollow block are manufacture per 50 kg cement bag in differnent sizes like 400x200x200mm, 400x200x150mm, 400x200x100mm. And need proper ratio as per sale quantity. pls send my mail mathi7599@gmail.com searching last two years not yet get pls find and enclosed pls. need practical analysis.
How foundation is designed, Column design and beam design
0 Answers College School Exams Tests, L&T,
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)