What is the difference between shuttering

Answer Posted / joy

shuttering means form work for concreting , and centering means proper positioning of reinforcement with shuttering.

Is This Answer Correct ?    24 Yes 15 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is diversion tunnel in a dam?

691


what is the design procedure for building

1760


How to calculate the area of a irregular sized land in square feet?and what will be the total area of this land South-51.1ft , North-47.7ft , East-53.3ft , West-54ft ?please explain me how to calculate?

1487


Define What is the difference between routing maintenance and major maintenance in school facilities?

743


Q 1) 1 Mason and 2 LABOUR / _________CUM brick work Q 2) 1 Mason and 1 LABOUR / _________SQ FT Plaster work Q 3) 1 Carpenter & 2 Labour/_________SQ FT shuttering work Q 4) 100 SQ FT roof slab concreting ____________mason and labour required

1542






what will be the total emoluments for deputy surveyor in APPSC in the payband of ( 9460-27600). please give me the detailed information step wise?

1880


what is the name of shuttering oil used in oman

2259


If we have the center line of the Finnish road level and we want to know what level of pay would have offset the Lhs and Rhus RHS 1,2.5,5 1,2.5,5 m.

1542


what are the ffactors you considered choosing the course?

1694


what is the calculation of raw material for 0.35cum of m-15

1039


if we know load bearing capacity of the soil and building load falling in each footing, then how to choose the type of foundation??? and if it is shallow foundation then which type of shallow foundation should be choosen i.e either strip or isolated or raft or combined or cantilever footing???????

1810


how to calculate the chair reinforcement length in slabs, footing or anywhere??

1882


how many type of admixtures for water stored structure?

1716


sir how can we find the cement and sand required for making 4" drop

1643


In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting? 2nd :- I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?

1675