Answer Posted / shamshair ali
the temporary support provided to the form work for supporting component parts of an arch, dome or other roofing structure is called centering
the temporary support beneath and at the sides of precast or cast in-situ concrete work is called shuttering.
Is This Answer Correct ? | 6 Yes | 4 No |
Post New Answer View All Answers
How will drive weight formula for circular cylinder steel bar in kg/ m please step by step drive?
if mineral admixture add into concrete then what is the differences between full cement concrete & fly ash added concrete of their SP. Gr.?and for the changes of SP. Gr. what is the changes in concrete
What is diversion tunnel in a dam?
how to frame the sentence in voucher pad ? Description : 1.Food Expenses during site visit 2.Stamp Paper approval expenses 3.Travelling expenses 4. sweet distribution
why are you joining in this (applied post) job and your aim for this job
How much cement and water required for cement selery????
Different sizes of Hollow blocks and its weight. Thanks.
how to calculate detail quantity of bricks and mortar for 500 cu.ft masonry work. consider wall thickness 9 inches
What is command line?
what is castigliano theaorem
What is the tallest man made structure in the world?
How to calculate cement and river sand material Qty for waterproofing base coat and finish coat
What is the Maximum %age of Steel in columns and beams ?
1. 1. The mass of a chunk of moist soil is 34 Kg and its volume is 0.012 cu. Meter. After drying in an oven, the mass reduces to 14.25 Kg. Determine the water content, the density of moist soil, the dry density, void ratio, porosity and degree of saturation. Take G = 3.25
what is the max. and mim. height of vertical post in informatry sign board which is used in highway projects.