What is the difference between shuttering

Answer Posted / shamshair ali

the temporary support provided to the form work for supporting component parts of an arch, dome or other roofing structure is called centering


the temporary support beneath and at the sides of precast or cast in-situ concrete work is called shuttering.

Is This Answer Correct ?    6 Yes 4 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

How will drive weight formula for circular cylinder steel bar in kg/ m please step by step drive?

1777


if mineral admixture add into concrete then what is the differences between full cement concrete & fly ash added concrete of their SP. Gr.?and for the changes of SP. Gr. what is the changes in concrete

1616


What is diversion tunnel in a dam?

691


how to frame the sentence in voucher pad ? Description : 1.Food Expenses during site visit 2.Stamp Paper approval expenses 3.Travelling expenses 4. sweet distribution

1686


why are you joining in this (applied post) job and your aim for this job

2118






How much cement and water required for cement selery????

1423


Different sizes of Hollow blocks and its weight. Thanks.

1926


how to calculate detail quantity of bricks and mortar for 500 cu.ft masonry work. consider wall thickness 9 inches

1220


What is command line?

685


what is castigliano theaorem

1833


What is the tallest man made structure in the world?

659


How to calculate cement and river sand material Qty for waterproofing base coat and finish coat

1885


What is the Maximum %age of Steel in columns and beams ?

720


1. 1. The mass of a chunk of moist soil is 34 Kg and its volume is 0.012 cu. Meter. After drying in an oven, the mass reduces to 14.25 Kg. Determine the water content, the density of moist soil, the dry density, void ratio, porosity and degree of saturation. Take G = 3.25

2140


what is the max. and mim. height of vertical post in informatry sign board which is used in highway projects.

2207