Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


why is the vector group analysis done in transformer tests

Answers were Sorted based on User's Feedback



why is the vector group analysis done in transformer tests..

Answer / rasool

1) the purpose of transformers based on vector group. (e-g)
for distribution purpose it is Dyn11

2)when your going to synchronise the two transformers it
must be the same vector group.

3) it is a common point that to measure the place
dispalacement between primary voltage and equlivalent
secondary voltage.

Is This Answer Correct ?    1 Yes 0 No

why is the vector group analysis done in transformer tests..

Answer / nallakumar

It is done basically for to check the magnetically balanced
condition for the two windings as well as for phase angle
displacements for to under go in the parallal operation mode
for a transformer.
it also tells the good comparision between
Delta-star,Star-delta and Star-Star or Delta-Delta.

Is This Answer Correct ?    1 Yes 0 No

why is the vector group analysis done in transformer tests..

Answer / susant kumar acharjya

vector group analysis is to determine the plarity strength between hv side and lv side

Is This Answer Correct ?    0 Yes 0 No

why is the vector group analysis done in transformer tests..

Answer / nissi engg solution krishna

to determine the phase displacement between primary and
sencondary sides

Is This Answer Correct ?    0 Yes 0 No

why is the vector group analysis done in transformer tests..

Answer / pratik patel

For parallel operation of transformer

Is This Answer Correct ?    0 Yes 0 No

why is the vector group analysis done in transformer tests..

Answer / jigar1334

because when we connect transfomer with grid at that time phase angle should be same as grid phase angle if phase angle will different than circulating current will flow

Is This Answer Correct ?    0 Yes 0 No

why is the vector group analysis done in transformer tests..

Answer / amit mathur

It is done basically for to check the magnetically balanced
condition for the two windings as well as for phase angle
displacements for to under go in the parallal operation mode
for a transformer.
it also tells the good comparision between
Delta-star,Star-delta and Star-Star or Delta-Delta.

Is This Answer Correct ?    2 Yes 4 No

why is the vector group analysis done in transformer tests..

Answer / mustaza

How to test the transformer vector group? and why this test
is important.

Is This Answer Correct ?    28 Yes 36 No

Post New Answer

More Electrical Engineering Interview Questions

how much test voltage should applied for tan delta test.

2 Answers   Electrical, TATA,


What is the use of 1:1 isolation t/f in any circuit...?

3 Answers  


Why insulation level follows this order? transformer < bus bar < circuit breaker & Isolator < transmission line.

0 Answers  


what is RMU ?

26 Answers   MacLellan, Shalaka Infra Tech,


what are the types of towers in HT transmission

2 Answers  


what are the C&D CHECK OF DG set

1 Answers   HCL,


how many earthing should give for transformer body and nuetral

5 Answers   GMR, GOMS,


i have installed my solar site of 6.7kw and is working perfectly , can somebody tell me that how can i measure my solar irradiation kw/day/sq m ?

3 Answers  


WHICH TYPE OF TRANSFORMER USED IN SWITCHYARD IN POWER PLANT?

15 Answers   GE, Lanco, NTPC,


PLEASE SEND THE PREVIOUS YEARS QUESTION PAPERS OF RRB JUNIOR ENGINEER-ELECTRICAL

0 Answers  


What is hysteresis loss?

1 Answers   PWD, SPML,


Rules and standards of electrical control wiring ?

0 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)