Answer / adarsh
Cement =(1*1.54/(1+2+4))/0.0347
= 6.34 bag
Sand =2*(1*1.54/(1+2+4))
=0.44 Cum.
Aggregate=4*(1*1.54/(1+2+4))
=0.88 Cum.
Assume
W/C= 0.55
Water = 6.34*0.347*0.55*1000
=120.998 l.
| Is This Answer Correct ? | 59 Yes | 22 No |
Answer / aamir shahzad
ratio is 1:2:4 sum is equle 7
1 bag cement is equle to 1.25
total quantity resum is 200 cft
dry Volume of total quantity which is 200 cft to multiply
1.54 will be the value of total quantity is 308 cft.
which is the total quantity 308 multiply 1(which is cement
ratio)and divided 7 which is the sum of ratio it will
become 44 and now we convert cft to cement bag which is the
value of 1.25 for bag.
44 divided by 1.25 is 35.2 the Sum is 35.2 Cement of Bags.
same for sand. which value was came after dry
308 multiply ratio of sand which is 2 then divided sum of
the ratio which is 7 will become the value of Sand is=88 cft
for crash 308 multiply 4 which is the value of crush and
devided by sum of value which is 7 total sum will become
176 cft.
Total sum of quantity of 1:2:4 mean.
Cement=35.2 Bags
Sand= 88 cft
Crush= 176 cft
These are right answer.
| Is This Answer Correct ? | 48 Yes | 17 No |
Answer / s.rama pandia raj ( asst.manag
i will go with answer of Mr.Adishankar, but i feel a small
suggestion
cement-1
sand-2 with bulking 25% is 2.5
metal- 4
volume of 1m3 of wet concrete is equal 1.54 times of dry
mix
so cement required is 1.54/7=0.22m3 of cement equals 6.34
bags (0.22/0.0347)
sand required is 2.5/7=0.357*1.54=0.55m3 or 0.22*2.5=0.55m3
metal required is 0.22*4=0.88m3
1m3 of 1:2:4 nominal concrete mix contains
cement-6.34 bags
sand - 0.55 m3 with 25% bulking in normal practice
metal - 0.88m3
| Is This Answer Correct ? | 22 Yes | 9 No |
Answer / ajmal
2.83 CU.M = 1 UNIT
1 UNIT = 22 BAG CEMENT
1 UNIT = 70 FEET SAND
1 UNIT = 90 FEET METAL
1 UNIT = 200 KG STEEL(NET ONLY)
| Is This Answer Correct ? | 20 Yes | 7 No |
Answer / mavani hitesh
for mixing of 1:2:4 proportion
1 is stand for cement, 2 stand for sand and 4 stand for aggregate.
for volume batching.standard pharma is used.which is of 35 liter.
for 1 bag proportion.
cement= 1 bag
sand= 2*35
= 70 liter
aggregate= 4*35
= 140 liter
in cum
1 cum = 1000 liter
70+140=210 liter
reduce 25% of 210 for wet mixed.
which comes 158 liter
1000 liter/158 = 6.36 bag of cement
| Is This Answer Correct ? | 19 Yes | 7 No |
Answer / buhari adam nuhu kaakamu
NOTE:
1 CuM of concrete
Avg. final mix (Decnce) (AFM) = 1.52
Total proportion (TP) 1+2+4 = 7
Unit weight of cement =1440 KG/CuM
Solution.
Cement quantity required = AFM/TP
= 1.52/7
= 0.217 CuM
Cement is measure by weight
So therefore you multiply 0.217 by unit weight of cement
Cement quantity = 0.217 * 1440 = 312.48 KG.
Number of Cement bags = 312.48 / 50
= 6.2496 bags
Sand quantity = TP * 2
= 0.217 * 2
= 0.434 CuM
Stone quantity = TP * 4
= 0.217 * 4
= 0.868 CuM
Quantity of materials
Cement Bags = 6.2496 Bags
Sand = 0.434 CuM
Stone = 0.868 CuM
| Is This Answer Correct ? | 11 Yes | 0 No |
Answer / ganesh
M15=1:2:4
1140/2=720*0.45=324/50=6.5/bags
1cement bag=0.0347/cum
Cement=0.0347*6.5=0.225
Sand=0.0347*2=0.451
Aggregate=0.0347*4=0.902
| Is This Answer Correct ? | 40 Yes | 30 No |
Answer / pandian.a
cement = spgr/1+2+4=1.56/7=0.22cum sp gr of 20 mm=1.56c
0.22*1440=317 kg
317/50=6.5 bags wt of cement =1440kg/cum
sand=0.22*2=0.44cum
coarse
aggregate=.22*4=0.88cum
so cement=605 bags
sand=0.44 cum (15.52cft)
corse aggregate=0.88cum (31.04cft)
w/c ratio=12.5litre/bags
| Is This Answer Correct ? | 13 Yes | 7 No |
Answer / narsimulu r sanghi
The ratio is 1:2:4, so total ratio is 1+2+4=7
considering 1cum.
cement = (1 x 15.4)/7= 2.2 cum
= 2.2/.347=6.3bags
sand=2.2x2=4.4cum
metal=2.2x4=8.8cum
| Is This Answer Correct ? | 45 Yes | 41 No |
why curing is necessary?
WET BULB TEMPERATURE AND DRY BULB TEMPERATURE?
how much anti termite treatment( ATT) liter used in one sq mtr floar area? & what is ratio of ATT & water.
how to calculate stair case landing slab bottom shuttering marking,angle of stair case? top landing length-1250mm treads length-2700mm(9X300mm) rise length-1500mm(10X150mm top landing level +1.5m lvl bottom level-0.00m lvl
what do you calaculate PCC/GRADE 10
How to calculate concrete,s cement, sand, metal on the bases of its ratio. For any volume of work please give me brief calculation
how to design and calculate materail quantity for concrete speedbreaker ?
how calculate cutting length of stell in slab and column? give brif discussion with formula?
3 Answers ATS, Gammon, Pegasus,
What are the different theories of failure under static load?
what is right & short method of measurement of slab&beam
List out the potential risk factors for workers on the construction site?
11. What was the reason for you to quit your previous job?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)