How to calculate concrete,s cement, sand, metal on the
bases of its ratio. For any volume of work please give me
brief calculation
Answers were Sorted based on User's Feedback
Answer / raghuram
if 1:2:4 is the ratio the cement require = (1/(4+2+1))x 1440
9density of cememnt)
sand required = (2/(4+2+1))x density of sand
similarly for agg
Is This Answer Correct ? | 16 Yes | 8 No |
1:2:4
1+2+4=7
cement- 1/7=.143*1.52=0.217cum
no. of bag 0.217/0.0347=6.26
sand- 2*0.217=0.434cum
c.a.-4*0.217=0.868cum
Is This Answer Correct ? | 10 Yes | 5 No |
Answer / dheeraj deshmukh
Mr. Ravsaheb,
The calculation is like below.
1/1+2+4=.142
.142x1.52x(1440/50)=.22
Hence, .22/.035=6.29bag/m3
Is This Answer Correct ? | 4 Yes | 4 No |
for concrete cubes samples.. what if the 7 days gain the strength of 42.34 mm/2 and the 28 days only gain the strength of 37.5 mm/2?
in the construction of residential building what type of tank are used?where?why & what is its purpose?
how many cement bags rquired for solid block construction for 100 sqft in 1:6 proportion?
acceptance criteria for concrete works
Will going from a 3-tap to 6-tap increase water pressure?
What is the difference between nominal mix and design mix?
What is Definition Of Refuse Area In Building ?
1 Answers Arpee Group, Dudhwala Builders,
what is the density of coarse sand
in plate load test what is the thickness of plate 20mm 5mm 50mm none
What is Rodding in Chimney construction?
How do we test on design and style in a software?
what grades of reinforcement steel are available in market